Miscellaneous action | | | 9/27/2012 | | DONE |
|
|
|
plans taken to records for scanning
|
INSP-Final Inspection | 9/24/2012 | 9/25/2012 | 9/25/2012 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled. Separate phone lines and alarm and trouble signals verified.
|
Issue and Print Permit | | | 9/24/2012 | | DONE |
|
|
|
|
Plan assigned to (Stephanie) | 9/19/2012 | | 9/21/2012 | | DONE |
Stephanie L. Cobbley
|
|
|
|
Alarm Plan Check | 9/21/2012 | | 9/21/2012 | | PASS |
Stephanie L. Cobbley
|
|
|
Plan modification approved with redlines and review comments.
|
PLANS TAKEN FRONT DESK ALARM | | | 9/21/2012 | | DONE |
|
|
|
Approved plan modification plans taken to permit technician for processing.
|
Permit Ready to Issue | | | 9/21/2012 | | DONE |
Barbara Stitt
|
|
|
|
Inspection Record Card- Fire | 9/21/2012 | | 9/21/2012 | | DONE |
Barbara Stitt
|
|
|
|
Telephone call | | | 9/21/2012 | | DONE |
Barbara Stitt
|
|
|
Called and spoke with Teresa and told her that permit is ready & fees due on 9-21-12 @ 11:45am//BAS
|
Plan resubmittals received | | | 9/19/2012 | | |
|
|
|
Plan modification recieved
|
INSP-Alarm Testing | 9/17/2012 | 9/17/2012 | 9/17/2012 | A | PART |
Forrest France
|
|
|
New system detectors passed on site functional testing.
|
INSP-Conference | 9/14/2012 | 9/14/2012 | 9/14/2012 | P | DONE |
Forrest France
|
|
|
Temporary occupancy approval given for a period of 18 days (expires October 1st) per agreement with R. Gervais. Conditions include a fire alarm permit application, installation, and inspection approval for offsite system monitoring as required per IFC 903.4.1.
|
INSP-Final Inspection | 9/13/2012 | 9/13/2012 | 9/13/2012 | P | FAIL |
Forrest France
|
|
|
Fire alarm panel does not report offsite per IFC conditions.
|
Issue and Print Permit | | | 9/11/2012 | | DONE |
|
|
|
|
Plan assigned to (Stephanie) | 9/5/2012 | | 9/10/2012 | | DONE |
Stephanie L. Cobbley
|
|
|
|
1st review completed | | | 9/10/2012 | | PASS |
|
|
|
|
Alarm Plan Check | 9/10/2012 | | 9/10/2012 | | PASS |
Stephanie L. Cobbley
|
|
|
Plans approved with redlines and review comments.
|
PLANS TAKEN FRONT DESK ALARM | | | 9/10/2012 | | DONE |
|
|
|
Approved redlined plans taken to permit technician for processing.
|
Telephone call | | | 9/10/2012 | | DONE |
Christina Prado
|
|
|
Called Brian to advise permit is ready
|
Inspection Record Card- Fire | 9/10/2012 | | 9/10/2012 | | DONE |
Christina Prado
|
|
|
|
Permit Ready to Issue | | | 9/10/2012 | | DONE |
Christina Prado
|
|
|
|
Application received | | | 9/5/2012 | | |
|
|
|
|