Miscellaneous action | | | 4/8/2013 | | DONE |
Tim Frost
|
|
|
Sent to Records for scanning.
|
INSP-Final Inspection | 11/15/2012 | 11/16/2012 | 11/16/2012 | A | PASS |
Forrest France
|
|
|
Fire sprinkler permit work passed final inspection.
|
INSP-Final Inspection | 11/13/2012 | 11/14/2012 | 11/16/2012 | P | PART |
Forrest France
|
|
|
|
INSP-Sprinkler Rough-in | 10/22/2012 | 10/22/2012 | 10/22/2012 | P | PART |
Troy Cobbley
|
|
|
Sprinkler piping is ok to cover. Two pendant heads were overspaced but to be verified at final inspection. See approved plans for locations. Stephen was installing hanger clips due to 100psi pressure on existing system from the fire pump.
|
Issue and Print Permit | | | 9/17/2012 | | DONE |
Tisha Gallop
|
|
|
|
Plan assigned to (Tim) | 9/10/2012 | | 9/13/2012 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 9/13/2012 | | 9/13/2012 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
1st review completed | | | 9/13/2012 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/13/2012 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 9/13/2012 | | DONE |
Barbara Stitt
|
|
|
|
Inspection Record Card- Fire | 9/13/2012 | | 9/13/2012 | | DONE |
Barbara Stitt
|
|
|
|
Telephone call | | | 9/13/2012 | | DONE |
Barbara Stitt
|
|
|
Called and told that permit is ready and fees due on 9-14-12 @ 8:20am//BAS
|
Application received | | | 9/10/2012 | | DONE |
Barbara Stitt
|
|
|
|