INSP-Final Inspection | 10/18/2012 | 10/18/2012 | 10/18/2012 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Sprinkler Rough-in | 10/2/2012 | 10/2/2012 | 10/3/2012 | P | PART |
Forrest France
|
|
|
Noted items completed. Overhead work approved for ceiling cover.
|
INSP-Sprinkler Rough-in | 9/25/2012 | 9/26/2012 | 9/26/2012 | A | PART |
Forrest France
|
|
|
Overhead modifications approved for cover. Item #3 on the project comments has not been completed, noted work room 202 is missing door and storefront to allow the "small room" exception.
|
Issue and Print Permit | | | 9/13/2012 | | DONE |
Barbara Stitt
|
|
|
|
Plan assigned to (Tim) | 9/11/2012 | | 9/12/2012 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 9/12/2012 | | 9/12/2012 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
1st review completed | | | 9/12/2012 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/12/2012 | | DONE |
Tim Frost
|
|
|
|
Telephone call | | | 9/12/2012 | | DONE |
Christina Prado
|
|
|
Called Sam to advise permit is ready
|
Inspection Record Card- Fire | 9/12/2012 | | 9/12/2012 | | DONE |
Christina Prado
|
|
|
|
Permit Ready to Issue | | | 9/12/2012 | | DONE |
Christina Prado
|
|
|
|
Application received | | | 9/11/2012 | | |
|
|
|
|