Miscellaneous action | | | 9/23/2013 | | DONE |
Tim Frost
|
|
|
Sent to Records for scanning.
|
INSP-Final Inspection | 4/18/2013 | 4/18/2013 | 4/18/2013 | A | PASS |
Troy Cobbley
|
|
|
permit finaled
|
INSP-Final Inspection | 4/9/2013 | 4/10/2013 | 4/10/2013 | A | CANC |
Forrest France
|
|
|
Work will be complete by 11:30 am. Plans are in the riser room Phone #: ###-#### >> Inspection requested via web by Sam Ball Inspection cancelled from web by: Sam Ball
|
INSP-Sprinkler Rough-in | 2/4/2013 | 2/4/2013 | 2/4/2013 | P | PART |
Forrest France
|
|
|
Correction items at second floor apt. 200 verified for completion- okay to cover.
|
INSP-Final Inspection | 1/30/2013 | 2/1/2013 | 1/31/2013 | A | CANC |
Forrest France
|
|
|
Call 30 minutes prior to arrival Phone #: ###-#### >> Inspection requested via web by Sam Ball Inspection cancelled from web by: Sam Ball
|
INSP-Sprinkler Rough-in/Hydro | 1/24/2013 | 1/24/2013 | 1/24/2013 | A | PART |
Forrest France
|
|
|
See dated annotations on plan regarding areas okayed including removal of the control valve in the basement and relocation of one pendent head at the 3rd floor unit 304. Work in apt. 300 is not complete, need to adjust placement of the added head in unit 200- see clouded plan note- min. spacing is 8'-0".
|
Issue and Print Permit | | | 10/18/2012 | | DONE |
|
|
|
|
Plan assigned to (Tim) | 9/13/2012 | | 9/17/2012 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 9/17/2012 | | 9/17/2012 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
1st review completed | | | 9/17/2012 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/17/2012 | | DONE |
Tim Frost
|
|
|
|
Inspection Record Card- Fire | 9/17/2012 | | 9/17/2012 | | DONE |
Darla L Downs
|
|
|
|
Permit Ready to Issue | | | 9/17/2012 | | |
|
|
|
|
Telephone call | | | 9/17/2012 | | |
|
|
|
9-17-12 called Absolute fire left message for Sam permit ready and fee given ///dld
|
Application received | | | 9/13/2012 | | DONE |
Barbara Stitt
|
|
|
|