Miscellaneous action | | | 12/3/2012 | | PASS |
|
|
|
Plans taken to records for scanning.
|
INSP-Final Inspection | 11/1/2012 | 11/2/2012 | 11/2/2012 | A | PASS |
Forrest France
|
|
|
Correction items verified for completion. Fire alarm permit final approved.
|
INSP-Final Inspection | 10/30/2012 | 10/31/2012 | 10/31/2012 | A | NR |
Forrest France
|
|
|
Activation of elevator machine room devices needs to initiate the flashing hat function, relocate the 1st floor lobby SD or relocate the adjacent HVAC diffusers. Noted elevator doors failed to open after HD shunt trip.
|
INSP-Alarm Testing | 10/22/2012 | 10/22/2012 | 10/30/2012 | A | PART |
Forrest France
|
|
|
Field verified previous corrections and adjustments. Completed testing at the FACP, sprinkler monitoring, MP, SD, notification circuts, duct detectors, verified monitoring. Items incomplete or not ready for testing include elevator control functions and hood suppression system monitoring.
|
INSP-Alarm Testing | 10/17/2012 | 10/19/2012 | 10/22/2012 | P | FAIL |
Forrest France
|
|
|
Completed initial walkthrough- noted 9 locations in need of revision regarding notification appliances including both first and second floor levels (insp. completed 10/19).
|
Plan assigned to (Stephanie) | 9/14/2012 | | 9/19/2012 | | DONE |
Stephanie L. Cobbley
|
|
|
|
1st review completed | | | 9/19/2012 | | PASS |
|
|
|
|
Alarm Plan Check | 9/19/2012 | | 9/19/2012 | | PASS |
Stephanie L. Cobbley
|
|
|
Plans approved with redlines and review comments.
|
PLANS TAKEN FRONT DESK ALARM | | | 9/19/2012 | | DONE |
|
|
|
Approved redlined plans taken to permit technician for processing.
|
Inspection Record Card- Fire | 9/19/2012 | | 9/19/2012 | | DONE |
Christina Prado
|
|
|
|
Permit Ready to Issue | | | 9/19/2012 | | DONE |
Christina Prado
|
|
|
|
Telephone call | | | 9/19/2012 | | DONE |
Christina Prado
|
|
|
called Sean to advise permit is ready
|
Issue and Print Permit | | | 9/19/2012 | | DONE |
|
|
|
|
Application received | | | 9/14/2012 | | |
|
|
|
|