Miscellaneous action | | | 4/8/2013 | | DONE |
Tim Frost
|
|
|
Sent to Records for scanning.
|
INSP-Final Inspection | 12/14/2012 | 12/17/2012 | 12/17/2012 | A | PASS |
Forrest France
|
|
|
Fire sprinkler work passed final walkthrough and inspection.
|
INSP-Final Inspection | 12/14/2012 | 12/14/2012 | 12/14/2012 | P | CANC |
Forrest France
|
|
|
Mark J is the contact. Thanks Phone #: ###-#### >> Inspection requested via web by Stan Beus Inspection cancelled from web by: Stan Beus
|
INSP-Sprinkler Rough-in | 11/1/2012 | 11/2/2012 | 11/2/2012 | A | PART |
Forrest France
|
|
|
Inspection for cold cavity protection completed okay after adjustments made while on site by the general contractor. Overhead rough-in approved for cover.
|
INSP-Sprinkler Rough-in/Hydro | 10/29/2012 | 10/30/2012 | 10/30/2012 | P | PART |
Forrest France
|
|
|
OH hydrostatic test completed.
|
Issue and Print Permit | | | 9/24/2012 | | DONE |
|
|
|
|
Plan assigned to (Tim) | 9/17/2012 | | 9/21/2012 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 9/21/2012 | | 9/21/2012 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
1st review completed | | | 9/21/2012 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/21/2012 | | DONE |
Tim Frost
|
|
|
|
Inspection Record Card- Fire | 9/21/2012 | | 9/21/2012 | | DONE |
Tisha Gallop
|
|
|
|
Permit Ready to Issue | | | 9/21/2012 | | DONE |
Tisha Gallop
|
|
|
|
Telephone call | | | 9/21/2012 | | DONE |
Tisha Gallop
|
|
|
called Cameron at Shilo and told him permit is ready and fee.
|
Application received | | | 9/17/2012 | | |
|
|
|
|