Case Summary | | | 1/31/2014 | | DONE |
|
|
|
|
Miscellaneous action | | | 2/14/2013 | | DONE |
|
|
|
Plans taken to records for scanning
|
INSP-Final Inspection | 1/23/2013 | 1/23/2013 | 1/23/2013 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Alarm Testing | 11/26/2012 | 11/26/2012 | 11/26/2012 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
(F) Reprint permit | | | 11/23/2012 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 11/23/2012 | | DONE |
|
|
|
|
Plan assigned to (Stephanie) | 11/14/2012 | | 11/21/2012 | | DONE |
Stephanie L. Cobbley
|
|
|
|
Telephone call | | | 11/21/2012 | | DONE |
|
|
|
Spoke to Robert Gobler to get clarification on scope of work and existing vs new/relocated/replaced devices. There was a room previously shown as not in scope of work, however it is part of the scope of work in the plan modification. He stated it is an employee restroom. I let him know that notification would be required even if it is not considered part of the 'building permit' scope of work because it is accessable by employees of the areas within the building scope of work. He stated he understood and will provide the device. I let him know there were other redlines to review.
|
Alarm Plan Check | 11/21/2012 | | 11/21/2012 | | PASS |
Stephanie L. Cobbley
|
|
|
Plan modifications approved with redlines and review comments.
|
PLANS TAKEN FRONT DESK ALARM | | | 11/21/2012 | | DONE |
|
|
|
Approved plan modifications taken to permit technician for processing.
|
Inspection Record Card- Fire | 11/21/2012 | | 11/21/2012 | | DONE |
Darla L Downs
|
|
|
|
Permit Ready to Issue | | | 11/21/2012 | | |
|
|
|
|
Telephone call | | | 11/21/2012 | | |
|
|
|
11-21-12 called Robert left message permit ready and fee given ///dld
|
Plan resubmittals received | | | 11/14/2012 | | DONE |
Tisha Gallop
|
|
|
PLAN MODIFICATION: Received two copies of application, submittal folder and plans; routed to SLC
|
INSP-Alarm Testing | 10/8/2012 | 10/9/2012 | 10/9/2012 | A | FAIL |
Troy Cobbley
|
|
|
Plan modifications are needed to show the actual wall and fire alarm device layout. This includes the location of the remoter annunciator and the manual pull station. Also it appears that an additional strobe will be required due to cabinent position and two smoke detectors need to be relocated away from air diffusers as discussed. No testing was performed.
|
Issue and Print Permit | | | 9/24/2012 | | DONE |
Barbara Stitt
|
|
|
|
Plan assigned to (Stephanie) | 9/19/2012 | | 9/21/2012 | | DONE |
Stephanie L. Cobbley
|
|
|
|
1st review completed | | | 9/21/2012 | | PASS |
|
|
|
|
Alarm Plan Check | 9/21/2012 | | 9/21/2012 | | PASS |
Stephanie L. Cobbley
|
|
|
Plans approved with redlines and review comments.
|
PLANS TAKEN FRONT DESK ALARM | | | 9/21/2012 | | DONE |
|
|
|
Approved redlined plans taken to permit technician for processing.
|
Inspection Record Card- Fire | 9/21/2012 | | 9/21/2012 | | DONE |
Tisha Gallop
|
|
|
|
Permit Ready to Issue | | | 9/21/2012 | | DONE |
Tisha Gallop
|
|
|
|
Telephone call | | | 9/21/2012 | | DONE |
Tisha Gallop
|
|
|
called Sentry Security and left vm permit is ready and fee.
|
Application received | | | 9/19/2012 | | |
|
|
|
|