INSP-Final Inspection | 11/8/2012 | 11/8/2012 | 11/8/2012 | P | PASS |
Forrest France
|
|
|
Fire sprinkler work passed final inspection.
|
INSP-Final Inspection | 11/2/2012 | 11/2/2012 | 11/5/2012 | P | NR |
Forrest France
|
|
|
Missing ceiling tile and 2nd pc. escutcheons at some locations.
|
INSP-Sprinkler Rough-in | 10/11/2012 | 10/12/2012 | 10/12/2012 | A | PASS |
Troy Cobbley
|
|
|
The dry pendant has been relocated to within 7' of the wall.
|
INSP-Sprinkler Rough-in | 10/9/2012 | 10/10/2012 | 10/10/2012 | A | FAIL |
Forrest France
|
|
|
Dry pendent head in the cooler/freezer needs to be installed per approved plans and NFPA 13 guidelines. Remainder of overhead rough-in inspection passed.
|
Issue and Print Permit | | | 9/24/2012 | | DONE |
|
|
|
|
Plan assigned to (Tim) | 9/19/2012 | | 9/20/2012 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 9/20/2012 | | 9/20/2012 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
1st review completed | | | 9/20/2012 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/20/2012 | | DONE |
Tim Frost
|
|
|
|
Telephone call | | | 9/20/2012 | | DONE |
Christina Prado
|
|
|
called Brook to advise permit is ready
|
Inspection Record Card- Fire | 9/20/2012 | | 9/20/2012 | | DONE |
Christina Prado
|
|
|
|
Permit Ready to Issue | | | 9/20/2012 | | DONE |
Christina Prado
|
|
|
|
Application received | | | 9/19/2012 | | |
|
|
|
|