INSP-Final Inspection | 12/6/2012 | 12/6/2012 | 12/7/2012 | P | PASS |
Forrest France
|
|
|
Noted items verified for completion. Fire sprinkler permit finaled.
|
INSP-Sprinkler Rough-in | 10/1/2012 | 10/1/2012 | 10/1/2012 | P | PART |
Forrest France
|
|
|
Fire sprinkler work okayed for cover at the drop ceilings. Contractor to provide verification of mfgs. recall status for the existing heads.
|
Issue and Print Permit | | | 9/24/2012 | | DONE |
|
|
|
|
Application received | | | 9/20/2012 | | |
|
|
|
|
Plan assigned to (Tim) | 9/20/2012 | | 9/20/2012 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 9/20/2012 | | 9/20/2012 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
1st review completed | | | 9/20/2012 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/20/2012 | | DONE |
Tim Frost
|
|
|
|
Inspection Record Card- Fire | 9/20/2012 | | 9/20/2012 | | DONE |
Darla L Downs
|
|
|
|
Permit Ready to Issue | | | 9/20/2012 | | |
|
|
|
|
Telephone call | | | 9/20/2012 | | |
|
|
|
9-20-12 called American Fire Protection permit ready and fee given ///dld
|