INSP-Final Inspection | 10/8/2012 | 10/8/2012 | 10/8/2012 | P | PASS |
Forrest France
|
|
|
Fire sprinkler work approved for final.
|
INSP-Sprinkler Rough-in | 9/26/2012 | 9/27/2012 | 9/27/2012 | A | PART |
Forrest France
|
|
|
Scope of fire sprinkler work okayed for cover at the drop ceilings.
|
INSP-Sprinkler Rough-in | 9/24/2012 | 9/25/2012 | 9/25/2012 | P | CANC |
Troy Cobbley
|
|
|
Overbooked. Asked contractor to reschedule for tomorrow.
|
Plan assigned to (Tim) | 9/20/2012 | | 9/24/2012 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 9/24/2012 | | 9/24/2012 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
1st review completed | | | 9/24/2012 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/24/2012 | | DONE |
Tim Frost
|
|
|
|
Inspection Record Card- Fire | 9/24/2012 | | 9/24/2012 | | DONE |
Alexandra L. DeYoung
|
|
|
|
Issue and Print Permit | | | 9/24/2012 | | DONE |
|
|
|
|
Application received | | | 9/20/2012 | | |
|
|
|
|