INSP-Final Inspection | 10/31/2012 | 11/1/2012 | 11/2/2012 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Final Inspection | 10/22/2012 | 10/23/2012 | 10/23/2012 | A | FAIL |
Troy Cobbley
|
|
|
Project is not ready for a final inspectio due to the ceiling tile has not been installed. Rough-in inspection has passed and the piping can now be covered.
|
INSP-Final Inspection | 10/19/2012 | 10/19/2012 | 10/19/2012 | P | FAIL |
Troy Cobbley
|
|
|
Inspection was actually a rough to cover. Sprinkler piping can be covered but the pendant head spacing can not exceed the 130 sq. ft. maximum as per the approved drawings. Revised hydraulic calculations can be submitted to verify a larger spacing or additional pendants added as discussed.
|
Plan assigned to (Tim) | 9/20/2012 | | 9/26/2012 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 9/26/2012 | | 9/26/2012 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
1st review completed | | | 9/26/2012 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/26/2012 | | DONE |
Tim Frost
|
|
|
|
Issue and Print Permit | | | 9/26/2012 | | DONE |
Barbara Stitt
|
|
|
|
Issue and Print Permit | | | 9/26/2012 | | DONE |
Barbara Stitt
|
|
|
|
Inspection Record Card- Fire | 9/26/2012 | | 9/26/2012 | | DONE |
Barbara Stitt
|
|
|
|
Application received | | | 9/20/2012 | | |
|
|
|
|