Miscellaneous action | | | 2/14/2013 | | DONE |
|
|
|
Plans taken to records for scanning
|
INSP-Final Inspection | 1/17/2013 | 1/17/2013 | 1/17/2013 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Alarm Testing | 1/16/2013 | 1/16/2013 | 1/16/2013 | P | FAIL |
Troy Cobbley
|
|
|
Retested and sent signals but none were received at central station. All so still need map and as-builts.
|
INSP-Final Inspection | 1/15/2013 | 1/15/2013 | 1/16/2013 | P | CANC |
Troy Cobbley
|
|
|
To be canceled per Rand Phone #: ###-####
|
Override - Parcel Holds | 1/16/2013 | 1/1/1900 | 1/16/2013 | | |
|
|
|
Fire alarm inspection
|
Override - Parcel Holds | 1/15/2013 | 1/1/1900 | 1/15/2013 | | |
|
|
|
alarm final
|
INSP-Final Inspection | 1/14/2013 | 1/14/2013 | 1/14/2013 | P | FAIL |
Troy Cobbley
|
|
|
For todays inspection we verified strobe spacing in the high ceiling areas. At the east end of the building Rand and I agreed that relocating one strobe in the low ceiling area will provide coverage in another high ceiling area. That work was performed as I waited. The smoke detectors were tested as well. However no signals were received at the monitoring station. To final this project signals need to be received, as-builts provided, map at the facp.
|
INSP-Final Inspection | 1/11/2013 | 1/11/2013 | 1/11/2013 | P | FAIL |
Troy Cobbley
|
|
|
Todays inspection was just verification that the notification circuits and devices functioned.They were out of sync but were repaired. EOL voltage was verified as ok. Candellas were adjusted in several locations due to spacing issues. Spacing was verified on only the low ceiling areas. The high ceilings will need to be checked later. As-builts will be required showing the revised circuits and candellas and additional devices.
|
INSP-Sprinkler Rough-in | 12/24/2012 | 12/24/2012 | 12/24/2012 | P | DONE |
Troy Cobbley
|
|
|
rand and I went over smoke alarms in the daycare area and strobe coverage.
|
Override - Parcel Holds | 12/24/2012 | 1/1/1900 | 12/24/2012 | | |
|
|
|
this is for fire inspection only
|
INSP-Final Inspection | 12/20/2012 | 12/21/2012 | 12/21/2012 | P | CANC |
Forrest France
|
|
|
Rand Phone #: ###-####
|
INSP-Final Inspection | 12/20/2012 | 12/20/2012 | 12/20/2012 | P | CANC |
Troy Cobbley
|
|
|
Notice of NSF check received 12-20-12 for this permit///final inspection cancelled until payment is received - Rand Phone #: ###-####
|
Override - Parcel Holds | 12/20/2012 | 1/1/1900 | 12/20/2012 | | |
|
|
|
fire final
|
Override - Parcel Holds | 12/20/2012 | 1/1/1900 | 12/20/2012 | | |
|
|
|
not this permit
|
Override - Parcel Holds | | | 12/3/2012 | | |
|
|
|
|
Issue and Print Permit | | | 12/3/2012 | | DONE |
|
|
|
|
Plan assigned to (Stephanie) | 9/28/2012 | | 11/29/2012 | | DONE |
Stephanie L. Cobbley
|
|
|
|
Alarm Plan Check | 11/29/2012 | | 11/29/2012 | | PASS |
Stephanie L. Cobbley
|
|
|
Resubmittals approved with redlines and review comments.
|
PLANS TAKEN FRONT DESK ALARM | | | 11/29/2012 | | DONE |
|
|
|
Approved plans taken to permit technician for processing.
|
Permit Ready to Issue | | | 11/29/2012 | | |
|
|
|
|
Inspection Record Card- Fire | 11/29/2012 | | 11/29/2012 | | DONE |
Darla L Downs
|
|
|
|
Telephone call | | | 11/29/2012 | | |
|
|
|
11-29-12 called Alarm Star permit ready and fee given ///dld
|
Plan resubmittals received | | | 11/21/2012 | | |
|
|
|
received 2 sets of plans and 1 circuit configuration taken to Steph in fire ///dld
|
Plan resubmittals received | | | 11/20/2012 | | DONE |
Tisha Gallop
|
|
|
received application and two copies of submittal documents and plans; routed to SLC
|
1st review completed | | | 10/11/2012 | | FAIL |
|
|
|
|
Alarm Plan Check | 10/11/2012 | | 10/11/2012 | | FAIL |
Stephanie L. Cobbley
|
|
|
Plans denied - see redlines and review comments.
|
Application received | | | 9/28/2012 | | |
|
|
|
|