INSP-Final Inspection | 10/23/2012 | 10/23/2012 | 10/23/2012 | P | PASS |
Forrest France
|
|
|
Scope of work completed. Fire sprinkler permit finaled.
|
INSP-Sprinkler Rough-in | 10/23/2012 | 10/23/2012 | 10/23/2012 | P | PART |
Forrest France
|
|
|
Rough-in passed inspection.
|
Issue and Print Permit | | | 10/10/2012 | | DONE |
Barbara Stitt
|
|
|
|
Plan assigned to (Tim) | 10/5/2012 | | 10/8/2012 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 10/8/2012 | | 10/8/2012 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
1st review completed | | | 10/8/2012 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/8/2012 | | DONE |
Tim Frost
|
|
|
|
Telephone call | | | 10/8/2012 | | DONE |
Christina Prado
|
|
|
called Donald to advise permit is ready and gave fees due
|
Inspection Record Card- Fire | 10/8/2012 | | 10/8/2012 | | DONE |
Christina Prado
|
|
|
|
Permit Ready to Issue | | | 10/8/2012 | | DONE |
Christina Prado
|
|
|
|
Application received | | | 10/5/2012 | | |
|
|
|
|