Miscellaneous action | | | 4/8/2013 | | DONE |
Tim Frost
|
|
|
Sent to Records for scanning.
|
INSP-Final Inspection | 11/23/2012 | 11/23/2012 | 11/23/2012 | A | PASS |
Forrest France
|
|
|
Fire sprinkler permit finaled.
|
INSP-Final Inspection | 11/20/2012 | 11/21/2012 | 11/23/2012 | A | PASS |
Forrest France
|
|
|
Fire sprinkler work passed final walkthrough.
|
INSP-Sprinkler Rough-in | 11/6/2012 | 11/6/2012 | 11/6/2012 | P | PART |
Forrest France
|
|
|
Overhead modifications and rough-in at the new office areas okayed.
|
Issue and Print Permit | | | 10/18/2012 | | DONE |
|
|
|
|
Plan assigned to (Tim) | 10/5/2012 | | 10/9/2012 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 10/9/2012 | | 10/9/2012 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
1st review completed | | | 10/9/2012 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/9/2012 | | DONE |
Tim Frost
|
|
|
|
Inspection Record Card- Fire | 10/9/2012 | | 10/9/2012 | | DONE |
Tisha Gallop
|
|
|
|
Permit Ready to Issue | | | 10/9/2012 | | DONE |
Tisha Gallop
|
|
|
|
Telephone call | | | 10/9/2012 | | DONE |
Tisha Gallop
|
|
|
called Sam at Absolute Fire and left vm permit is ready and fee.
|
Application received | | | 10/5/2012 | | DONE |
Barbara Stitt
|
|
|
|