INSP-Final Inspection | 7/24/2013 | 7/25/2013 | 7/26/2013 | P | PASS |
Forrest France
|
|
|
UG fire supply line permit finaled.
|
FIR-Aging Inspection | 7/23/2013 | 7/23/2013 | 7/23/2013 | | NR |
Troy Cobbley
|
|
|
work is in progress
|
INSP-Supply line flush | 4/22/2013 | 4/23/2013 | 4/23/2013 | A | PASS |
Troy Cobbley
|
|
|
Underground flush passed on second residence from the north end.
|
FIR-Aging Inspection | 3/15/2013 | 3/15/2013 | 3/15/2013 | | NR |
Troy Cobbley
|
|
|
work is in progress
|
INSP-Sprinkler Rough-in/Hydro | 12/5/2012 | 12/6/2012 | 12/6/2012 | A | PASS |
Troy Cobbley
|
|
|
See the city approved plans for the remaining three underground supply lines that are ok to cover.
|
INSP-Sprinkler Rough-in | 11/7/2012 | 11/8/2012 | 11/8/2012 | A | PASS |
Troy Cobbley
|
|
|
Three of the five underground supplies are ok for cover. See the city approved plans for locations.
|
Issue and Print Permit | | | 10/12/2012 | | DONE |
Barbara Stitt
|
|
|
|
Plan assigned to (Tim) | 10/9/2012 | | 10/11/2012 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 10/11/2012 | | 10/11/2012 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
1st review completed | | | 10/11/2012 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/11/2012 | | DONE |
Tim Frost
|
|
|
|
Telephone call | | | 10/11/2012 | | DONE |
Christina Prado
|
|
|
Called and left message for Jon giving fees due and advising permit is ready
|
Inspection Record Card- Fire | 10/11/2012 | | 10/11/2012 | | DONE |
Christina Prado
|
|
|
|
Permit Ready to Issue | | | 10/11/2012 | | DONE |
Christina Prado
|
|
|
|
Application received | | | 10/9/2012 | | |
|
|
|
|