INSP-Final Inspection | 1/31/2014 | 1/31/2014 | 1/31/2014 | P | PASS |
Forrest France
|
|
|
UG fire supply line permit approved for final status.
|
INSP-Sprinkler Rough-in/Hydro | 12/31/2013 | 12/31/2013 | 12/31/2013 | P | PART |
Forrest France
|
|
|
UG fire supply line passed hydrostatic test 12/30/13.
|
INSP-Supply line flush | 12/17/2013 | 12/17/2013 | 12/17/2013 | A | PART |
Forrest France
|
|
|
UG fire supply line flush completed acceptable
|
INSP-Sprinkler Rough-in/Hydro | 12/11/2013 | 12/12/2013 | 12/12/2013 | A | NR |
Forrest France
|
|
|
Please call Colton 30 mins prior Phone #: ###-#### >> Inspection requested via web by Jacci Hunt
|
INSP-Sprinkler Rough-in | 12/11/2013 | 12/11/2013 | 12/11/2013 | P | PART |
Craig D. Hanson
|
|
|
3rd floor pass.
|
INSP-Supply line flush | 12/11/2013 | 12/11/2013 | 12/11/2013 | P | NR |
Craig D. Hanson
|
|
|
Could not find road box to turn on water.
|
INSP-Sprinkler Rough-in | 10/11/2013 | 10/11/2013 | 10/11/2013 | A | PART |
Craig D. Hanson
|
|
|
1st and 2nd floor apts only. Heads in areas with drop celling not in yet (areas not framed yet). Dry wall heads in Front stairwell not in yet (waiting for heads). All other piping and head locations good.
|
INSP-Sprinkler Rough-in/Hydro | 9/4/2013 | 9/6/2013 | 9/6/2013 | A | NR |
Forrest France
|
|
|
Please schedule an UG hydro Phone #: ###-#### >> Inspection requested via web by Jacci Hunt
|
INSP-Sprinkler Rough-in/Hydro | 6/27/2013 | 6/28/2013 | 6/28/2013 | A | PART |
Forrest France
|
|
|
Remainder of UG fire supply line okayed for cover- added 90's to be included on plan modification as well as retainer glands in place of thrust blocking.
|
INSP-Sprinkler Rough-in | 6/26/2013 | 6/27/2013 | 6/27/2013 | A | PART |
Forrest France
|
|
|
|
FIR-Aging Inspection | 4/4/2013 | 4/4/2013 | 4/4/2013 | | DONE |
Forrest France
|
|
|
Site work in progress
|
INSP-Sprinkler Rough-in | 10/12/2012 | 10/12/2012 | 10/12/2012 | P | PART |
Forrest France
|
|
|
UG fire supply line ductile riser and stub out to a point 10' beyond the stem wall is approved for bury. See stamped plans for dated annotations.
|
Application received | | | 10/11/2012 | | DONE |
Barbara Stitt
|
|
|
|
Plan assigned to (Tim) | 10/11/2012 | | 10/11/2012 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 10/11/2012 | | 10/11/2012 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
1st review completed | | | 10/11/2012 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/11/2012 | | DONE |
Tim Frost
|
|
|
|
Inspection Record Card- Fire | 10/11/2012 | | 10/11/2012 | | DONE |
Barbara Stitt
|
|
|
|
Permit Ready to Issue | | | 10/11/2012 | | DONE |
Barbara Stitt
|
|
|
|
Telephone call | | | 10/11/2012 | | DONE |
Barbara Stitt
|
|
|
Called Aaron and told him that permit is ready & fees due on 10-11-12 @ 9:45am//BAS
|
Issue and Print Permit | | | 10/11/2012 | | DONE |
|
|
|
|