Miscellaneous action | | | 4/8/2013 | | DONE |
Tim Frost
|
|
|
Sent to Records for scanning.
|
INSP-Final Inspection | 1/31/2013 | 2/1/2013 | 2/1/2013 | A | PASS |
Forrest France
|
|
|
Final inspection items completed and passed. Permit finaled.
|
INSP-Final Inspection | 1/30/2013 | 1/31/2013 | 1/31/2013 | A | FAIL |
Troy Cobbley
|
|
|
Provide city approved plan, provide correct orfice for the test connection, provide head box with extra heads/wrench, provie service tag, test bell and remove the handles from the backflow.
|
INSP-Sprinkler Rough-in | 11/8/2012 | 11/8/2012 | 11/8/2012 | P | PART |
Forrest France
|
|
|
Overhead okay to cover, insulation at piping verified.
|
INSP-Sprinkler Rough-in | 11/5/2012 | 11/5/2012 | 11/5/2012 | P | PART |
Forrest France
|
|
|
Overhead rough-in inspection completed. Be aware of possible light fixture obstructions at the mud room and laundry room. Cover approval pending tenting/insulation for cold cavity protection.
|
Issue and Print Permit | | | 10/31/2012 | | DONE |
Barbara Stitt
|
|
|
|
Plan assigned to (Tim) | 10/11/2012 | | 10/26/2012 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 10/26/2012 | | 10/26/2012 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/26/2012 | | DONE |
Tim Frost
|
|
|
|
Inspection Record Card- Fire | 10/26/2012 | | 10/26/2012 | | DONE |
Tisha Gallop
|
|
|
|
Permit Ready to Issue | | | 10/26/2012 | | DONE |
|
|
|
|
Telephone call | | | 10/26/2012 | | DONE |
Tisha Gallop
|
|
|
called Don and told him permit is ready and fee.
|
Plan resubmittals received | | | 10/23/2012 | | DONE |
Tisha Gallop
|
|
|
received three copies of application, submittal docs and plans; routed to Tim Frost.
|
Sprinkler Plan Check | 10/15/2012 | | 10/15/2012 | | FAIL |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
1st review completed | | | 10/15/2012 | | FAIL |
Tim Frost
|
|
|
|
Miscellaneous action | | | 10/15/2012 | | DONE |
Tim Frost
|
|
|
Emailed review to contractor
|
Telephone call | | | 10/15/2012 | | DONE |
Tisha Gallop
|
|
|
called Don and told left vm denied plan at front desk to pick up.
|
Application received | | | 10/11/2012 | | DONE |
Barbara Stitt
|
|
|
|