INSP-Final Inspection | 12/17/2012 | 12/17/2012 | 12/17/2012 | P | PASS |
Forrest France
|
|
|
Fire alarm permit finaled.
|
INSP-Alarm Testing | 12/17/2012 | 12/17/2012 | 12/17/2012 | A | PART |
Forrest France
|
|
|
Fire alarm testing completed satisfactory. Descriptor at the panel to correctly indicate each riser waterflow.
|
INSP-Final Inspection | 12/13/2012 | 12/14/2012 | 12/14/2012 | A | PEND |
Forrest France
|
|
|
|
Miscellaneous action | | | 12/3/2012 | | DONE |
|
|
|
Plans taken to records for scanning.
|
CHANGE STATUS TO (ISS) | | | 12/3/2012 | | |
|
|
|
final by mistake
|
INSP-Final Inspection | 11/29/2012 | 11/30/2012 | 11/30/2012 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
Issue and Print Permit | | | 10/23/2012 | | DONE |
|
|
|
|
Plan assigned to (Stephanie) | 10/12/2012 | | 10/22/2012 | | DONE |
Stephanie L. Cobbley
|
|
|
|
1st review completed | | | 10/22/2012 | | PASS |
|
|
|
|
Alarm Plan Check | 10/22/2012 | | 10/22/2012 | | PASS |
Stephanie L. Cobbley
|
|
|
Plans approved with redlines and review comments.
|
PLANS TAKEN FRONT DESK ALARM | | | 10/22/2012 | | DONE |
|
|
|
Approved plans taken to the permit technician for processing.
|
Inspection Record Card- Fire | 10/22/2012 | | 10/22/2012 | | DONE |
Tisha Gallop
|
|
|
|
Permit Ready to Issue | | | 10/22/2012 | | DONE |
|
|
|
|
Telephone call | | | 10/22/2012 | | DONE |
Tisha Gallop
|
|
|
called and left messg permit is ready and fee.
|
Application received | | | 10/12/2012 | | |
|
|
|
|