Permit Information
Permit NumberFIR12-00639
StatusFinaled
Name PHOENIX FIRE PROTECTION
Site Address 996 S LONGMONT AVE
Project NameRiverside West Apartments.
Customer Number 
ePlanReviewNo
Description
The fire sprinkler scope of work consists of three level building protect with NFPA 13 sprinkler systems. The basement level is mainly parking with a recreation room and an ADA apartment. The first and second levels are apartments. The basement level is protected with a dry system except for the ADA unit and recreation room. The upper levels are protected with a wet system including floor control valves. Extended coverage sprinklers are being utilized. A new 6”x25’ C-900 underground pipe will be brought into an outside riser room. The riser room will have a 3” backflow preventer with a 3” riser, 3” dry pipe valve and 2” wet riser manifold. The basement level will have steel piping the other levels will have CPVC piping.

Contractor’s Note:
The building permit has not been issued at this time. The building department may determine that changes are required to the building plans in order to meet code. The changes may affect the sprinkler system. The sprinkler contractor will be obligated to make all necessary changes that may be required. Therefore, if the sprinkler contractor chooses to proceed without an issued building permit, they will do so on their own cognizance. This note does not constitute an early start agreement.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Miscellaneous action  3/6/2014 DONE
DetailsTim Frost
Sent to Records for scanning.
INSP-Final Inspection2/12/20142/13/20142/13/2014PPASS
DetailsForrest France
Fire sprinkler permit finaled.
INSP-Final Inspection2/11/20142/12/20142/12/2014PFAIL
DetailsForrest France
Missing trim and finishes at several locations, damaged SW head at the west stair 3rd floor, non-functional high/low air switch. Not ready for final.
INSP-Sprinkler Rough-in/Hydro2/3/20142/3/20142/3/2014APART
DetailsForrest France
OH hydrostatic test of the wet system completed and passed.
INSP-Sprinkler Rough-in/Hydro2/3/20142/3/20142/3/2014APART
DetailsForrest France
OH hydrostatic test of the new dry system passed.
INSP-Sprinkler Rough-in/Hydro1/31/20141/31/20141/31/2014PNH
DetailsForrest France
PSI reduced prior to completion of test.
INSP-Sprinkler Rough-in/Hydro1/17/20141/21/20141/17/2014PCANC
DetailsForrest France
Please call Colton 30 mins prior Phone #: ###-#### >> Inspection requested via web by Jacci Hunt Inspection cancelled from web by: Jacci Hunt
INSP-Sprinkler Rough-in/Hydro12/30/201312/30/201312/30/2013PPART
DetailsForrest France
UG fire supply line hydrostatic test passed.
INSP-Sprinkler Rough-in/Hydro12/23/201312/23/201312/23/2013PNR
DetailsForrest France
Incomplete work at the dry system, 1st and 2nd floor wet systems. UG fire supply line unable to maintain 200 psig.
INSP-Sprinkler Rough-in/Hydro12/12/201312/16/201312/17/2013PPART
DetailsForrest France
Noted corrections at dry system, discussed OH and UG hydrostatic test schedule.
INSP-Supply line flush12/12/201312/16/201312/17/2013APART
DetailsForrest France
Please call Colton 30 mins prior Phone #: ###-#### >> Inspection requested via web by Jacci Hunt
CHANGE STATUS TO (ISS)  12/11/2013 DONE
DetailsBarbara Stitt
(F) Reprint permit  12/11/2013 DONE
DetailsBarbara Stitt
Plan assigned to (Tim)12/3/2013 12/10/2013 DONE
DetailsTim Frost
Miscellaneous action  12/10/2013 DONE
Plan Mod #2 - 12/10/2013
Rcvd new hyd from Phoneix today 12/10/2013. The report is still wrong. I manually asjusted the hyd to the correct the problem. SInce they have a large enought cushion the hydraulics DO work.
Sprinkler Plan Check12/10/2013 12/10/2013 PASS
DetailsTim Frost
Please, see attached comments.
PLANS/APPL TAKEN TO FRONT DESK  12/10/2013 DONE
DetailsTim Frost
Telephone call  12/10/2013 DONE
Called Aaron to advise permit is ready and gave fees due
Permit Ready to Issue  12/10/2013 DONE
DetailsChristina Prado
Inspection Record Card- Fire12/10/2013 12/10/2013 DONE
DetailsChristina Prado
Plan resubmittals received  12/3/2013 DONE
DetailsTisha Gallop
Plan Modification: Recieved three copies of application, submittal docs and plans; rotued to Fire
INSP-Sprinkler Rough-in11/25/201311/26/201311/26/2013AFAIL
DetailsForrest France
Inspection for cover at the second floor (3rd level) failed due to installation not matching plans- calc area included. Provide plan modification for changes prior to approval for cover.
CHANGE STATUS TO (ISS)  10/11/2013 DONE
DetailsTisha Gallop
picked up plan mod
Plan assigned to (Tim)10/4/2013 10/10/2013 DONE
DetailsTim Frost
Sprinkler Plan Check10/10/2013 10/10/2013 FAIL
DetailsTim Frost
Miscellaneous action  10/10/2013 DONE
DetailsTim Frost
Emailed contractor in regards to failed review.
Plan resubmittals received  10/10/2013  
received 3 sets of plans/application sent to Tim F.
Sprinkler Plan Check10/10/2013 10/10/2013 PASS
DetailsTim Frost
Please, see attached comments.
PLANS/APPL TAKEN TO FRONT DESK  10/10/2013 DONE
DetailsTim Frost
Telephone call  10/10/2013 DONE
DetailsTisha Gallop
called Aaron and told him permit is ready and fee due.
Permit Ready to Issue  10/10/2013 DONE
DetailsTisha Gallop
plan mod
Inspection Record Card- Fire10/10/2013 10/10/2013 DONE
DetailsTisha Gallop
Plan resubmittals received  10/4/2013 DONE
DetailsTisha Gallop
received three copies of application, submittal docs, and plans; routed to Tim F.
Plan resubmittals received  10/2/2013  
10-2-13 received 4 sets of plans sent to Tim F.
INSP-Sprinkler Rough-in9/18/20139/19/20139/23/2013ANR
DetailsForrest France
INSP-Sprinkler Rough-in/Hydro9/20/20139/23/20139/23/2013ANR
DetailsForrest France
Rough-in inspection at second floor incomplete due to changes in floorplan, main and branchline routing. Tie-ins at the east stairway unfinished. Need to provide stamped resubmittals reflecting actual pipe routing and accurate floorplan prior to approval for cover.
FIR-Aging Inspection4/4/20134/4/20134/5/2013 DONE
DetailsForrest France
Site construction in process
Plan assigned to (Tim)11/1/2012 11/19/2012 DONE
DetailsTim Frost
Sprinkler Plan Check11/19/2012 11/19/2012 PASS
DetailsTim Frost
Please, see attached comments.
There are NO annotations on the plans.
PLANS/APPL TAKEN TO FRONT DESK  11/19/2012 DONE
DetailsTim Frost
Telephone call  11/19/2012 DONE
DetailsChristina Prado
Called Aaron to advise permit is ready and gave fees due
Inspection Record Card- Fire11/19/2012 11/19/2012 DONE
DetailsChristina Prado
Permit Ready to Issue  11/19/2012 DONE
DetailsChristina Prado
Issue and Print Permit  11/19/2012 DONE
DetailsBarbara Stitt
Plan resubmittals received  11/13/2012  
Sprinkler Plan Check11/7/2012 11/7/2012 FAIL
DetailsTim Frost
Please, see attached comments.
There are NO annotations on the plans.
1st review completed  11/7/2012 FAIL
DetailsTim Frost
Miscellaneous action  11/7/2012 DONE
Emailed contractor the review
CHANGE STATUS TO (REV)  11/7/2012  
Telephone call  11/7/2012  
11-7-12 called Phoenix Fire Protection-left message for Aaron permit ready for pick up ///dld
Application received  11/1/2012