Miscellaneous action | | | 2/14/2013 | | DONE |
|
|
|
Plans taken to records for scanning
|
INSP-Final Inspection | 2/4/2013 | 2/6/2013 | 2/6/2013 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
Permit Ready to Issue | | | 1/22/2013 | | DONE |
Tisha Gallop
|
|
|
|
CHANGE STATUS TO (ISS) | | | 1/22/2013 | | DONE |
Tisha Gallop
|
|
|
|
Fees Due Hold | 11/21/2012 | | 1/22/2013 | | DONE |
Tisha Gallop
|
|
|
|
Plan assigned to (Stephanie) | 1/8/2013 | | 1/16/2013 | | DONE |
Stephanie L. Cobbley
|
|
|
|
Alarm Plan Check | 1/16/2013 | | 1/16/2013 | | PASS |
Stephanie L. Cobbley
|
|
|
Plan modification approved with review comments.
|
PLANS TAKEN FRONT DESK ALARM | | | 1/16/2013 | | DONE |
|
|
|
Approved plan modification documents taken to permit technician for processing.
|
Telephone call | | | 1/16/2013 | | DONE |
Barbara Stitt
|
|
|
Called Jason and told him that permit is ready & fees due on 1-16-13 @ 11:20am//BAS
|
Plan resubmittals received | | | 1/8/2013 | | |
|
|
|
received 2 applications/fire alarm submittal checklist & 2 sets of plans sent to SLC
|
INSP-Final Inspection | 11/19/2012 | 11/20/2012 | 11/20/2012 | A | FAIL |
Troy Cobbley
|
|
|
The zone 6 still did not report within the required 90 seconds. I then verified the actual time on a general alarm and found that it did not report to the monitoring station within the 90 seconds either. The fire alarm system shall meet current timing requirements as per NFPA 72. A re-inspection fee has been applied to this job for any more inspections.
|
INSP-Final Inspection | 11/19/2012 | 11/19/2012 | 11/19/2012 | P | FAIL |
Troy Cobbley
|
|
|
The duct smoke detectors on zone 6 still are not reporting to the monitoring station.
|
INSP-Final Inspection | 11/16/2012 | 11/16/2012 | 11/16/2012 | P | PART |
Troy Cobbley
|
|
|
A temporary occupancy was given with Scott Arellano's permission until the correct programming of the duct smoke detectors is accomplished with the monitoring company. All other items have been corrected. The hvac units had not previously been wired for shut down but are now.
|
INSP-Final Inspection | 11/15/2012 | 11/16/2012 | 11/16/2012 | A | FAIL |
Troy Cobbley
|
|
|
The fire alarm control panel only has one phone line, monitoring is not set up correctly (no alarm or supervisory signals were received), hvac units did not shut down upon detection of smoke and as-builts are needed showing the additional tamper switch as well as the smoke detector above the ceiling.
|
Issue and Print Permit | | | 11/14/2012 | | DONE |
Barbara Stitt
|
|
|
|
Plan assigned to (Stephanie) | 11/5/2012 | | 11/13/2012 | | DONE |
Stephanie L. Cobbley
|
|
|
|
Telephone call | | | 11/13/2012 | | DONE |
|
|
|
Spoke to Jason at AEI and requested a revised system matrix that includes the sprinkler monitoring and sprinkler flow bell actuation, but removes the evacuation signal actuation.
|
Miscellaneous action | | | 11/13/2012 | | DONE |
|
|
|
Received requested documentation.
|
1st review completed | | | 11/13/2012 | | PASS |
|
|
|
|
Alarm Plan Check | 11/13/2012 | | 11/13/2012 | | PASS |
Stephanie L. Cobbley
|
|
|
Plans approved with redlines and review comments.
|
PLANS TAKEN FRONT DESK ALARM | | | 11/13/2012 | | DONE |
|
|
|
Approved plans taken to the permit technician for processing.
|
Inspection Record Card- Fire | 11/13/2012 | | 11/13/2012 | | DONE |
Barbara Stitt
|
|
|
|
Permit Ready to Issue | | | 11/13/2012 | | DONE |
Barbara Stitt
|
|
|
|
Telephone call | | | 11/13/2012 | | DONE |
Barbara Stitt
|
|
|
Called Jason and told him that permit is ready & fees due on 11-13-12 @ 3:05pm//BAS
|
Application received | | | 11/5/2012 | | |
|
|
|
|