Case Summary | | | 1/30/2014 | | DONE |
|
|
|
|
Miscellaneous action | | | 9/24/2013 | | DONE |
|
|
|
Documents scanned into Onbase and Tidemark
|
INSP-Final Inspection | 9/3/2013 | 9/4/2013 | 9/4/2013 | P | PASS |
Troy Cobbley
|
|
|
permit finaled
|
INSP-Final Inspection | 8/29/2013 | 8/30/2013 | 8/30/2013 | A | CANC |
Troy Cobbley
|
|
|
Canceled per voice mail. johnathon Phone #: ###-####
|
INSP-Final Inspection | 8/29/2013 | 8/29/2013 | 8/29/2013 | P | FAIL |
Troy Cobbley
|
|
|
See the city approved plans for corrections noted. They include overspaced strobes, need for an additional strobe in a corridor, tamper switch/supervisory signal text at panel and central station needing modified so it does not say "waterflow", water turned on so the flow switch can be tested, signage at the facp door, map at the facp, knox box....ect.
|
FIR-Aging Inspection | 6/28/2013 | 6/28/2013 | 6/28/2013 | | DONE |
Troy Cobbley
|
|
|
work is in progress
|
FIR-Aging Inspection | 3/27/2013 | 3/27/2013 | 3/27/2013 | | NR |
Troy Cobbley
|
|
|
work is in progress
|
Issue and Print Permit | | | 11/26/2012 | | DONE |
|
|
|
|
Plan assigned to (Stephanie) | 11/7/2012 | | 11/19/2012 | | DONE |
Stephanie L. Cobbley
|
|
|
|
1st review completed | | | 11/19/2012 | | PASS |
|
|
|
|
Alarm Plan Check | 11/19/2012 | | 11/19/2012 | | PASS |
Stephanie L. Cobbley
|
|
|
Plans approved with redlines and review comments.
|
PLANS TAKEN FRONT DESK ALARM | | | 11/19/2012 | | DONE |
|
|
|
Approved plans taken to permit technician for processing.
|
Permit Ready to Issue | | | 11/19/2012 | | DONE |
Barbara Stitt
|
|
|
|
Inspection Record Card- Fire | 11/19/2012 | | 11/19/2012 | | DONE |
Barbara Stitt
|
|
|
|
Telephone call | | | 11/19/2012 | | DONE |
Barbara Stitt
|
|
|
Left message for Brad that permit is ready and fees due on 11-19-12 @ 3:50pm//BAS
|
Application received | | | 11/7/2012 | | DONE |
Barbara Stitt
|
|
|
|