Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberFIR12-00663
StatusFinaled
Name SHILO AUTOMATIC SPRINKLER CO
Site Address 11862 FAIRVIEW
Project NameCLOVERLEAF PLAZA 4PLEX UNITS
Customer Number 
ePlanReviewNo
Description
The fire sprinkler scope of work consists of a 13R wet system in a new 4-plex apartment building. The system has a 2” combination supply with a Neptune meter, 1½” backflow preventer and 1½” FDC. The system utilizes extended coverage 18’x18’ sprinklers and cpvc piping. The piping is tented in the attic space.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Miscellaneous action  9/23/2013 DONE
DetailsTim Frost
Sent to Records for scanning.
INSP-Final Inspection7/9/20137/10/20137/10/2013APASS
DetailsTroy Cobbley
Permit finaled by tim frost on 2/22/13
FIR-Aging Inspection7/9/20137/9/20137/9/2013 PASS
DetailsTroy Cobbley
INSP-Final Inspection2/21/20132/22/20132/22/2013PPASS
DetailsTim Frost
*Re-assingned by Scott Arellano*

Robert Phone #: ###-####
INSP-Sprinkler Rough-in/Hydro1/7/20131/7/20131/7/2013PPASS
DetailsTroy Cobbley
The overhead hydro for 1st floor and rough to cover for 2nd floor passed. Sprinkler piping can be covered.
INSP-Sprinkler Rough-in1/4/20131/4/20131/4/2013PFAIL
DetailsTroy Cobbley
This was a tenting inspection. The tenting is still not secured to the trusses in many locations and can be easily moved. Piping is not approved for cover.
INSP-Sprinkler Rough-in/Hydro1/4/20131/4/20131/4/2013PFAIL
DetailsTroy Cobbley
Sprinkler rough-in for both floors passed but piping can not be covered on the second floor until the tenting has been repaired. Also the hydro test failed again.Starting presure was at 222psi and ended at 213psi.
INSP-Sprinkler Rough-in/Hydro1/2/20131/3/20131/3/2013PPART
DetailsTroy Cobbley
Todays inspection was for above ground hydro test. The second floor test passed. The first floor test failed due to a visable leak at the 1 1/2" cplg between the ball valve and ready riser.
INSP-Sprinkler Rough-in/Hydro12/31/20121/2/20131/2/2013PCANC
DetailsTroy Cobbley
This is an oh hydro Robert is the contact. Thanks Phone #: ###-#### >> Inspection requested via web by Stan Beus Inspection cancelled from web by: Stan Beus
INSP-Sprinkler Rough-in/Hydro12/27/201212/31/201212/31/2012PCANC
DetailsTroy Cobbley
Robert is the contact. Thanks Phone #: ###-#### >> Inspection requested via web by Stan Beus Inspection cancelled from web by: Stan Beus
Issue and Print Permit  11/26/2012 DONE
DetailsBarbara Stitt
Plan assigned to (Tim)11/13/2012 11/21/2012 DONE
DetailsTim Frost
Plan assigned to (Tim)11/13/2012 11/21/2012 DONE
DetailsTim Frost
Plan resubmittals received  11/21/2012  
Sprinkler Plan Check11/21/2012 11/21/2012 PASS
DetailsTim Frost
Please, see attached comments.
There are NO annotations on the plans.
PLANS/APPL TAKEN TO FRONT DESK  11/21/2012 DONE
DetailsTim Frost
Permit Ready to Issue  11/21/2012 DONE
DetailsTisha Gallop
Inspection Record Card- Fire11/21/2012 11/21/2012 DONE
DetailsTisha Gallop
Telephone call  11/21/2012 DONE
DetailsTisha Gallop
called Cameron and told him permit is ready and fee.
1st review completed  11/15/2012 FAIL
DetailsTim Frost
Miscellaneous action  11/15/2012 DONE
DetailsTim Frost
eMAILED REVIEW TO CONTRACTOR
Sprinkler Plan Check11/15/2012 11/15/2012 FAIL
DetailsTim Frost
pLEASE, SEE ATTACHED COMMENTS.
tHERE ARE no ANNOTATIONS ON THE PLANS.
Telephone call  11/15/2012 DONE
DetailsBarbara Stitt
Called Cameron and told him that plans were denied and need re-submitted on 11-15-12 @ 8:23am BAS
Application received  11/13/2012