Miscellaneous action | | | 9/23/2013 | | DONE |
Tim Frost
|
|
|
Sent to Records for scanning.
|
INSP-Final Inspection | 7/9/2013 | 7/10/2013 | 7/10/2013 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled by tim frost on 2/22/13
|
FIR-Aging Inspection | 7/9/2013 | 7/9/2013 | 7/9/2013 | | PASS |
Troy Cobbley
|
|
|
|
INSP-Final Inspection | 2/21/2013 | 2/22/2013 | 2/22/2013 | P | PASS |
Tim Frost
|
|
|
*Re-assingned by Scott Arellano*
Robert Phone #: ###-####
|
INSP-Sprinkler Rough-in/Hydro | 1/7/2013 | 1/7/2013 | 1/7/2013 | P | PASS |
Troy Cobbley
|
|
|
The overhead hydro for 1st floor and rough to cover for 2nd floor passed. Sprinkler piping can be covered.
|
INSP-Sprinkler Rough-in | 1/4/2013 | 1/4/2013 | 1/4/2013 | P | FAIL |
Troy Cobbley
|
|
|
This was a tenting inspection. The tenting is still not secured to the trusses in many locations and can be easily moved. Piping is not approved for cover.
|
INSP-Sprinkler Rough-in/Hydro | 1/4/2013 | 1/4/2013 | 1/4/2013 | P | FAIL |
Troy Cobbley
|
|
|
Sprinkler rough-in for both floors passed but piping can not be covered on the second floor until the tenting has been repaired. Also the hydro test failed again.Starting presure was at 222psi and ended at 213psi.
|
INSP-Sprinkler Rough-in/Hydro | 1/2/2013 | 1/3/2013 | 1/3/2013 | P | PART |
Troy Cobbley
|
|
|
Todays inspection was for above ground hydro test. The second floor test passed. The first floor test failed due to a visable leak at the 1 1/2" cplg between the ball valve and ready riser.
|
INSP-Sprinkler Rough-in/Hydro | 12/31/2012 | 1/2/2013 | 1/2/2013 | P | CANC |
Troy Cobbley
|
|
|
This is an oh hydro Robert is the contact. Thanks Phone #: ###-#### >> Inspection requested via web by Stan Beus Inspection cancelled from web by: Stan Beus
|
INSP-Sprinkler Rough-in/Hydro | 12/27/2012 | 12/31/2012 | 12/31/2012 | P | CANC |
Troy Cobbley
|
|
|
Robert is the contact. Thanks Phone #: ###-#### >> Inspection requested via web by Stan Beus Inspection cancelled from web by: Stan Beus
|
Issue and Print Permit | | | 11/26/2012 | | DONE |
Barbara Stitt
|
|
|
|
Plan assigned to (Tim) | 11/13/2012 | | 11/21/2012 | | DONE |
Tim Frost
|
|
|
|
Plan assigned to (Tim) | 11/13/2012 | | 11/21/2012 | | DONE |
Tim Frost
|
|
|
|
Plan resubmittals received | | | 11/21/2012 | | |
|
|
|
|
Sprinkler Plan Check | 11/21/2012 | | 11/21/2012 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/21/2012 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 11/21/2012 | | DONE |
Tisha Gallop
|
|
|
|
Inspection Record Card- Fire | 11/21/2012 | | 11/21/2012 | | DONE |
Tisha Gallop
|
|
|
|
Telephone call | | | 11/21/2012 | | DONE |
Tisha Gallop
|
|
|
called Cameron and told him permit is ready and fee.
|
1st review completed | | | 11/15/2012 | | FAIL |
Tim Frost
|
|
|
|
Miscellaneous action | | | 11/15/2012 | | DONE |
Tim Frost
|
|
|
eMAILED REVIEW TO CONTRACTOR
|
Sprinkler Plan Check | 11/15/2012 | | 11/15/2012 | | FAIL |
Tim Frost
|
|
|
pLEASE, SEE ATTACHED COMMENTS.
tHERE ARE no ANNOTATIONS ON THE PLANS.
|
Telephone call | | | 11/15/2012 | | DONE |
Barbara Stitt
|
|
|
Called Cameron and told him that plans were denied and need re-submitted on 11-15-12 @ 8:23am BAS
|
Application received | | | 11/13/2012 | | |
|
|
|
|