Miscellaneous action | | | 4/8/2013 | | DONE |
Tim Frost
|
|
|
Sent to Records for scanning.
|
INSP-Final Inspection | 1/2/2013 | 1/2/2013 | 1/2/2013 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Sprinkler Rough-in | 12/19/2012 | 12/19/2012 | 12/19/2012 | P | PASS |
Troy Cobbley
|
|
|
The sprinkler piping can be covered. Joist space has been filled with insulation.
|
INSP-Sprinkler Rough-in | 12/14/2012 | 12/17/2012 | 12/17/2012 | A | PASS |
Troy Cobbley
|
|
|
Rough-in passed. Piping is ok to cover. Will verify at the final that the joist spaces have been filled with insulation.
|
Permit Ready to Issue | | | 12/3/2012 | | DONE |
|
|
|
|
Issue and Print Permit | | | 12/3/2012 | | DONE |
|
|
|
|
Plan assigned to (Tim) | 11/20/2012 | | 11/29/2012 | | DONE |
Tim Frost
|
|
|
|
Plan assigned to (Tim) | 11/20/2012 | | 11/29/2012 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 11/29/2012 | | 11/29/2012 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
1st review completed | | | 11/29/2012 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/29/2012 | | DONE |
Tim Frost
|
|
|
|
Inspection Record Card- Fire | 11/29/2012 | | 11/29/2012 | | DONE |
Alexandra L. DeYoung
|
|
|
|
Application received | | | 11/20/2012 | | |
|
|
|
|