Permit Information
Permit NumberFIR12-00679
StatusFinaled
Name CURTIS FIRE SPRINKLER SERVICE INC
Site Address 495 S 15TH ST
Project NameRevolution Vodka
Customer Number 
ePlanReviewNo
Description
The fire sprinkler scope of work consists of provide protection for a new distillery in a single floor historic building. A room within the tenant space is used for storage of flammable liquids 1B and is classified as H3. The system is a side feed system.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Miscellaneous action  4/8/2013 DONE
DetailsTim Frost
Sent to Records for scanning.
INSP-Final Inspection3/6/20133/6/20133/7/2013PPASS
DetailsForrest France
Fire sprinkler permit finaled.
INSP-Supply line flush3/6/20133/6/20133/7/2013PPART
DetailsForrest France
UG fire supply line flush completed satisfactory.
INSP-Final Inspection3/5/20133/5/20133/5/2013PPEND
DetailsForrest France
Final pending project related fire alarm permit work.
INSP-Sprinkler Rough-in/Hydro2/27/20132/27/20133/1/2013PPART
DetailsForrest France
Overhead rough-in inspection completed. Need to add retainers on sidewall head piping below tanks, heads at the zone of influence near unit heaters to be correct temp rating per NFPA 13.
INSP-Sprinkler Rough-in/Hydro2/27/20132/27/20132/27/2013APART
DetailsForrest France
UG fire supply line hydrostatic testing passed.
INSP-Sprinkler Rough-in/Hydro2/19/20132/19/20132/21/2013PPART
DetailsForrest France
Overhead hydrostatic testing completed satisfactory.
INSP-Sprinkler Rough-in/Hydro2/8/20132/8/20132/8/2013PNH
DetailsForrest France
underground hydro - Don Phone #: ###-#### * No access to complete inspection.
Override - Parcel Holds2/8/20131/1/19002/8/2013  
underground fire
INSP-Conference2/7/20132/7/20132/7/2013ADONE
DetailsForrest France
Regarding hydrostatic testing
INSP-Conference1/30/20131/31/20131/31/2013ADONE
DetailsTroy Cobbley
Don requested that the FDC be moved from the 15th street side of th building to the north side alley. I contacted Tim Frost and it was determined that the FDC needs to remain on the 15th street side of the building but could be moved down the wall alittle.
INSP-Sprinkler Rough-in1/28/20131/29/20131/29/2013APART
DetailsForrest France
UG fire supply line thrust blocking verified,- okay to bury. Discussed seismic clearance at the ductile riser when floor slab is poured.
INSP-Sprinkler Rough-in1/28/20131/28/20131/28/2013PNH
DetailsForrest France
No access to complete inspection.
Override - Parcel Holds1/28/20131/1/19001/28/2013  
FIr underground only
INSP-Sprinkler Rough-in1/25/20131/25/20131/25/2013PPART
DetailsForrest France
Ductile UG fire supply line stub-in and riser install verified. Discussed thrust blocking and joint restraint.
Override - Parcel Holds1/25/20131/1/19001/25/2013  
fire inspection
Issue and Print Permit  12/13/2012 DONE
Plan assigned to (Tim)11/21/2012 12/12/2012 DONE
DetailsTim Frost
Sprinkler Plan Check12/12/2012 12/12/2012 PASS
DetailsTim Frost
Please, see attached comments.
There are NO annotations on the plans.
PLANS/APPL TAKEN TO FRONT DESK  12/12/2012 DONE
DetailsTim Frost
Inspection Record Card- Fire12/12/2012 12/12/2012 DONE
DetailsDarla L Downs
Telephone call  12/12/2012  
12-12-12 called Don -Curtis Fire -permit ready and fee given ///dld
Plan resubmittals received  12/7/2012  
Sprinkler Plan Check11/27/2012 11/27/2012 FAIL
DetailsTim Frost
Please, see attached comments.
There are NO annotations on the plans.
1st review completed  11/27/2012 FAIL
DetailsTim Frost
Miscellaneous action  11/27/2012 DONE
DetailsTim Frost
Emailed review to contractor
Telephone call  11/27/2012  
11-27-12 called Don Curtis Fire Sprinkler permit needs picked up ///dld
Application received  11/21/2012