Miscellaneous action | | | 9/24/2013 | | DONE |
|
|
|
Documents scanned into Onbase and Tidemark
|
INSP-Final Inspection | 4/29/2013 | 4/30/2013 | 4/30/2013 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled. Monitoring was not set up correctly. Fire dept dispatch was not set up, zone descriptions were wrong and the site address was wrong. I waited while things were corrected.
|
Override - Parcel Holds | 4/29/2013 | 1/1/1900 | 4/29/2013 | | |
|
|
|
Fire arlarm inspection
|
FIR-Aging Inspection | 4/2/2013 | 4/2/2013 | 4/3/2013 | | NR |
Troy Cobbley
|
|
|
Work is in progress
|
Issue and Print Permit | | | 12/12/2012 | | DONE |
|
|
|
|
Plan assigned to (Stephanie) | 11/28/2012 | | 12/10/2012 | | DONE |
Stephanie L. Cobbley
|
|
|
|
Miscellaneous action | | | 12/10/2012 | | DONE |
|
|
|
Emailed Rob with Protex requesting revised battery calculations to include the correct current draws for the remote annuciator, the smoke detector, and the duct detectors.
|
Miscellaneous action | | | 12/10/2012 | | DONE |
|
|
|
Received requested information/documentation, as well as an email stating the duct detectors would be powered from the roof top unit and not the fire alarm control panel.
|
1st review completed | | | 12/10/2012 | | PASS |
|
|
|
|
Alarm Plan Check | 12/10/2012 | | 12/10/2012 | | PASS |
Stephanie L. Cobbley
|
|
|
Plans approved with redlines and review comments.
|
PLANS TAKEN FRONT DESK ALARM | | | 12/10/2012 | | DONE |
|
|
|
Approved plans taken to permit technician for processing.
|
Permit Ready to Issue | | | 12/10/2012 | | DONE |
Barbara Stitt
|
|
|
|
Inspection Record Card- Fire | 12/10/2012 | | 12/10/2012 | | DONE |
Barbara Stitt
|
|
|
|
Telephone call | | | 12/10/2012 | | DONE |
Barbara Stitt
|
|
|
Called and spoke with Brandy and told her that permit is ready and fees due on 12-10-12 @ 11:30am//BAS
|
Application received | | | 11/28/2012 | | |
|
|
|
|