INSP-Final Inspection | 3/20/2013 | 3/21/2013 | 3/21/2013 | A | PASS |
Forrest France
|
|
|
Fire sprinkler permit work passed final walkthrough. Final approved.
|
INSP-Sprinkler Rough-in | 2/19/2013 | 2/20/2013 | 2/21/2013 | P | PASS |
Forrest France
|
|
|
Okay to cover overhead fire sprinkler work at the drop ceilings.
|
Inspection Record Card- Fire | 12/27/2012 | | 12/27/2012 | | DONE |
Darla L Downs
|
|
|
|
Permit Ready to Issue | | | 12/27/2012 | | |
|
|
|
|
Issue and Print Permit | | | 12/27/2012 | | |
|
|
|
|
Issue and Print Permit | | | 12/27/2012 | | DONE |
|
|
|
|
Plan assigned to (Tim) | 12/10/2012 | | 12/21/2012 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 12/21/2012 | | 12/21/2012 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/21/2012 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 12/10/2012 | | 12/10/2012 | | FAIL |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
1st review completed | | | 12/10/2012 | | FAIL |
Tim Frost
|
|
|
|
Application received | | | 12/7/2012 | | |
|
|
|
|