INSP-Final Inspection | 12/17/2013 | 12/17/2013 | 12/18/2013 | P | PASS |
Forrest France
|
|
|
|
INSP-Final Inspection | 12/12/2013 | 12/13/2013 | 12/13/2013 | A | PART |
Forrest France
|
|
|
Incomplete ceilings, finishes and construction for shell work at the lobby and entry areas.
|
INSP-Final Inspection | 11/27/2013 | 12/2/2013 | 12/3/2013 | A | PART |
Forrest France
|
|
|
Need to relocate outside bell at the main street side above the correct FDC, 1st floor tenant work underway.
|
INSP-Final Inspection | 11/19/2013 | 11/22/2013 | 11/26/2013 | A | NR |
Forrest France
|
|
|
Mike B is the contact. Thanks Phone #: ###-#### >> Inspection requested via web by Stan Beus
|
INSP-Sprinkler Rough-in | 4/3/2013 | 4/3/2013 | 4/3/2013 | A | PART |
Forrest France
|
|
|
Reinspection for C/N items
|
INSP-Sprinkler Rough-in/Hydro | 3/27/2013 | 3/29/2013 | 3/29/2013 | P | PART |
Forrest France
|
|
|
1st floor shell protection hydrostatic test passed.
|
INSP-Sprinkler Rough-in | 2/26/2013 | 2/27/2013 | 3/1/2013 | P | PART |
Forrest France
|
|
|
Basement level only- not including the FP room
|
INSP-Sprinkler Rough-in | 2/28/2013 | 2/28/2013 | 3/1/2013 | A | PART |
Forrest France
|
|
|
Rough-in at the 1st floor level- ref. plans for annotations regarding corrections and adjustments to be made.
|
Sprinkler Plan Check | 12/20/2012 | | 12/20/2012 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
1st review completed | | | 12/20/2012 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/20/2012 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 12/20/2012 | | DONE |
Christina Prado
|
|
|
|
Inspection Record Card- Fire | 12/20/2012 | | 12/20/2012 | | DONE |
Christina Prado
|
|
|
|
Issue and Print Permit | | | 12/20/2012 | | DONE |
Christina Prado
|
|
|
|
Plan assigned to (Tim) | 12/18/2012 | | 12/19/2012 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 12/18/2012 | | 12/18/2012 | | FAIL |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
1st review completed | | | 12/18/2012 | | FAIL |
Tim Frost
|
|
|
|
Application received | | | 12/12/2012 | | DONE |
|
|
|
Application submitted via PDS Online on Dec 12 2012 1:29PM
|