Case Summary | | | 3/1/2013 | | DONE |
|
|
|
|
INSP-Final Inspection | 2/22/2013 | 2/25/2013 | 2/26/2013 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled. Rick is going to provide the signage at the bell.
|
INSP-Sprinkler Rough-in | 1/29/2013 | 1/29/2013 | 1/29/2013 | P | PART |
Forrest France
|
|
|
UG fire supply line approved for bury.
|
Inspection Record Card- Fire | 1/4/2013 | | 1/4/2013 | | DONE |
Darla L Downs
|
|
|
|
Permit Ready to Issue | | | 1/4/2013 | | |
|
|
|
|
Issue and Print Permit | | | 1/4/2013 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 1/2/2013 | | DONE |
Tisha Gallop
|
|
|
|
Sprinkler Plan Check | 12/31/2012 | | 12/31/2012 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/31/2012 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 12/28/2012 | | 12/28/2012 | | FAIL |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
Plan assigned to (Tim) | 12/28/2012 | | 12/28/2012 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 12/20/2012 | | 12/20/2012 | | FAIL |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
1st review completed | | | 12/20/2012 | | FAIL |
Tim Frost
|
|
|
|
Plan assigned to (Tim) | 12/20/2012 | | 12/20/2012 | | DONE |
Tim Frost
|
|
|
|
Application received | | | 12/14/2012 | | DONE |
|
|
|
Application submitted via PDS Online on Dec 14 2012 9:26PM
|