Information based on query as of Thursday, September 26, 2024.
Permit Information
Permit NumberFIR12-00742
StatusFinaled
Name ABSOLUTE FIRE PROTECTION
Site Address 408 E PARKCENTER BLVD Unit: 350
Project NamePACIFIC SOURCE
Customer Number 
ePlanReviewNo
Description
The fire sprinkler scope of work consists of adding, plugging and relocating sprinklers to accommodate new wall and ceiling configuration
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Miscellaneous action  4/8/2013 DONE
DetailsTim Frost
Sent to Records for scanning.
INSP-Final Inspection1/22/20131/23/20131/23/2013APASS
DetailsTroy Cobbley
Permit finaled. Sheating in the corridor is labeled as fire rated.
INSP-Final Inspection1/15/20131/16/20131/16/2013PNR
DetailsForrest France
INSP-Sprinkler Rough-in1/11/20131/14/20131/14/2013APART
DetailsForrest France
Remainder of overhead fire sprinkler work at the remodel areas approved for ceiling cover.
INSP-Sprinkler Rough-in/Hydro1/8/20131/9/20131/9/2013PPART
DetailsForrest France
Fire sprinkler work at the open office area 108 is approved for cover. Ref. plan annotations for clouded and dated areas.
Issue and Print Permit  1/7/2013 DONE
Plan assigned to (Tim)12/19/2012 1/2/2013 DONE
DetailsTim Frost
Sprinkler Plan Check1/2/2013 1/2/2013 FAIL
DetailsTim Frost
Please, see attached comments.
There are NO annotations on the plans.
Telephone call  1/2/2013  
1-2-13 called Absolute Fire Protection permit fail ///dld
Plan resubmittals received  1/2/2013 DONE
rec'd 3 copies
Sprinkler Plan Check1/2/2013 1/2/2013 PASS
DetailsTim Frost
Please, see attached comments.
There are NO annotations on the plans.
PLANS/APPL TAKEN TO FRONT DESK  1/2/2013 DONE
DetailsTim Frost
Permit Ready to Issue  1/2/2013 DONE
DetailsTisha Gallop
Inspection Record Card- Fire1/2/2013 1/2/2013 DONE
DetailsTisha Gallop
Telephone call  1/2/2013 DONE
DetailsTisha Gallop
called Sam Ball and left vm permit is ready and fee.
Plan resubmittals received  12/28/2012 DONE
DetailsChristina Prado
received three sets of plans, applications, checklists & related submital documents; Gave to Tim for review
Sprinkler Plan Check12/27/2012 12/27/2012 FAIL
DetailsTim Frost
Please, see attached comments.
There are NO annotations on the plans.
1st review completed  12/27/2012 FAIL
DetailsTim Frost
Miscellaneous action  12/27/2012 DONE
DetailsTim Frost
Emailed review to contractor
Telephone call  12/27/2012 DONE
DetailsChristina Prado
called Sam to advise plans are here for pick up and resubmittals are needed
Application received  12/19/2012