(F) Reprint permit | | | 7/8/2014 | | DONE |
Candy A. Nichols
|
|
|
|
Miscellaneous action | | | 4/16/2013 | | DONE |
|
|
|
Plans taken to records for scanning
|
INSP-Final Inspection | 3/14/2013 | 3/15/2013 | 3/15/2013 | A | PASS |
Troy Cobbley
|
|
|
permit finaled
|
CHANGE STATUS TO (ISS) | | | 3/14/2013 | | DONE |
Barbara Stitt
|
|
|
|
(F) Reprint permit | | | 3/14/2013 | | DONE |
Barbara Stitt
|
|
|
|
Alarm Plan Check | 3/12/2013 | | 3/12/2013 | | FAIL |
Stephanie L. Cobbley
|
|
|
plan modification denied - previous redlines not addressed.
|
Telephone call | | | 3/12/2013 | | DONE |
|
|
|
Spoke to Tim at Crane Alarm to let him know I need to deny the plans because previous redlines were not incorporated. He said he would pick up the denied set later this afternoon.
|
Miscellaneous action | | | 3/12/2013 | | DONE |
|
|
|
Placed denied submittals in drawer at permit desk.
|
Plan resubmittals received | | | 3/12/2013 | | DONE |
Christina Prado
|
|
|
received two sets of plans, applications, checklists & required submittal docs; routed to steph for review
|
Alarm Plan Check | 3/12/2013 | | 3/12/2013 | | PASS |
Stephanie L. Cobbley
|
|
|
Plan modification resubmittals approved
|
PLANS TAKEN FRONT DESK ALARM | | | 3/12/2013 | | DONE |
|
|
|
approved plans taken to permit technician for processing.
|
Inspection Record Card- Fire | 3/12/2013 | | 3/12/2013 | | DONE |
Barbara Stitt
|
|
|
|
Permit Ready to Issue | | | 3/12/2013 | | DONE |
Barbara Stitt
|
|
|
|
Plan assigned to (Stephanie) | 3/7/2013 | | 3/12/2013 | | DONE |
Stephanie L. Cobbley
|
|
|
Plan modification
|
Plan resubmittals received | | | 3/7/2013 | | |
|
|
|
PLan Modification
|
INSP-Final Inspection | 1/16/2013 | 1/17/2013 | 1/17/2013 | P | FAIL |
Troy Cobbley
|
|
|
The audible notification devices are not synchronized as required per NFPA 72 18.4.2.5 . The tenant area new devices do not sync with the existing area corridor devices.
|
INSP-Final Inspection | 1/15/2013 | 1/16/2013 | 1/16/2013 | P | CANC |
Troy Cobbley
|
|
|
Cancel per tim Phone #: ###-####
|
INSP-Final Inspection | 1/8/2013 | 1/8/2013 | 1/8/2013 | P | FAIL |
Troy Cobbley
|
|
|
The new 15cd strobe in the corridor is overspaced. Also notification needs to be extended into the corridor in front of the restrooms since the door that is shown on the building plans has not been installed. No testing was actually performed. All other spacing within the tenant space appears ok. Tim and I discussed options.
|
Telephone call | | | 1/8/2013 | | DONE |
|
|
|
Inspector Cobbley called to discuss redlines I put on the floorplan. There were two areas/spaces that were not labeled for use, so I stated these areas would need to be field verified for use and notification requirements. The area the the north of device NO;3-2 was verified to be a small corridor leading from the tenant space to a restroom corridor. The door shown separating the restroom corridor from this space is not actually there. Because the building permit scope of work included this area due to door hardware requirements, it makes it part of the fire alarm scope of work as well. This space requires a notification device due to its use (which the contractor did install). However, because the 2nd door is not there, it is open to the restroom corridor and requires notification in that space as well under this permit. I let the inspector know that any other notification deficiencies outside the spaces mentioned above would need to be turned over to the fire department and would not affect this permit scope of work. This building does require full notification due to greater than 100 occupant load above the lowest level of exit discharge.
|
Issue and Print Permit | | | 12/27/2012 | | DONE |
Barbara Stitt
|
|
|
|
Plan assigned to (Stephanie) | 12/20/2012 | | 12/24/2012 | | DONE |
Stephanie L. Cobbley
|
|
|
|
1st review completed | | | 12/24/2012 | | PASS |
|
|
|
|
Alarm Plan Check | 12/24/2012 | | 12/24/2012 | | PASS |
Stephanie L. Cobbley
|
|
|
Plans approved with redlines and review comments.
|
PLANS TAKEN FRONT DESK ALARM | | | 12/24/2012 | | DONE |
|
|
|
Approved redlined plans taken to permit technician for processing.
|
Inspection Record Card- Fire | 12/24/2012 | | 12/24/2012 | | DONE |
Darla L Downs
|
|
|
|
Permit Ready to Issue | | | 12/24/2012 | | |
|
|
|
|
Permit Ready to Issue | | | 12/24/2012 | | |
|
|
|
|
Telephone call | | | 12/24/2012 | | |
|
|
|
12-24-12 called Crane Alarm Company left message permit ready and fee given ///dld
|
Application received | | | 12/20/2012 | | DONE |
Barbara Stitt
|
|
|
|