INSP-Final Inspection | 5/1/2013 | 5/2/2013 | 5/2/2013 | A | PASS |
Forrest France
|
|
|
Inspection passed. Fire sprinkler permit finaled.
|
INSP-Sprinkler Rough-in | 4/1/2013 | 4/1/2013 | 4/1/2013 | A | PART |
Forrest France
|
|
|
Overhead fire sprinkler work at the grid ceilings is approved for cover- ref. dated notes on plans.
|
INSP-Sprinkler Rough-in | 2/6/2013 | 2/6/2013 | 2/6/2013 | P | PART |
Forrest France
|
|
|
Okay to cover fire sprinkler work at the sheetrock ceilings- see clouded notes on plans.
|
Plan assigned to (Tim) | 12/20/2012 | | 12/21/2012 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 12/21/2012 | | 12/21/2012 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
1st review completed | | | 12/21/2012 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/21/2012 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 12/21/2012 | | DONE |
Barbara Stitt
|
|
|
|
Inspection Record Card- Fire | 12/21/2012 | | 12/21/2012 | | DONE |
Barbara Stitt
|
|
|
|
Telephone call | | | 12/21/2012 | | DONE |
Barbara Stitt
|
|
|
Left voice message for Sam that permit is ready and fees due on 12-21-12 @ 9:50am///BAS
|
Issue and Print Permit | | | 12/21/2012 | | DONE |
Tisha Gallop
|
|
|
|
Application received | | | 12/20/2012 | | DONE |
Barbara Stitt
|
|
|
|