INSP-Final Inspection | 3/4/2013 | 3/4/2013 | 3/4/2013 | A | PASS |
Forrest France
|
|
|
Fire sprinkler work passed final walkthrough.
|
INSP-Final Inspection | 3/1/2013 | 3/1/2013 | 3/1/2013 | A | NR |
Forrest France
|
|
|
Plans are in the closet on the East side of the space Phone #: ###-#### >> Inspection requested via web by Sam Ball
|
INSP-Sprinkler Rough-in | 2/18/2013 | 2/19/2013 | 2/19/2013 | A | PART |
Forrest France
|
|
|
Okay to cover overhead work at the drop ceilings - plans marked and dated.
|
Plan assigned to (Tim) | 12/20/2012 | | 12/21/2012 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 12/21/2012 | | 12/21/2012 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
1st review completed | | | 12/21/2012 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/21/2012 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 12/21/2012 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 12/21/2012 | | 12/21/2012 | | DONE |
Tisha Gallop
|
|
|
|
Telephone call | | | 12/21/2012 | | DONE |
Tisha Gallop
|
|
|
called Sam Ball and left vm permit is ready and fee.
|
Issue and Print Permit | | | 12/21/2012 | | DONE |
Tisha Gallop
|
|
|
|
Application received | | | 12/20/2012 | | |
|
|
|
|