INSP-Final Inspection | 3/4/2013 | 3/4/2013 | 3/4/2013 | P | PASS |
Troy Cobbley
|
|
|
permit finaled
|
INSP-Sprinkler Rough-in/Hydro | 3/4/2013 | 3/4/2013 | 3/4/2013 | A | PASS |
Troy Cobbley
|
|
|
Overhead hydro test passed
|
INSP-Sprinkler Rough-in/Hydro | 3/1/2013 | 3/1/2013 | 3/1/2013 | A | CANC |
Troy Cobbley
|
|
|
Piping was not ready for inspection when I stopped at the project the first time. I could not make it back due to schedule when the piping was ready. Per Sam and I's discussion this will be rescheduled for monday.
|
Inspection Record Card- Fire | 1/7/2013 | | 1/7/2013 | | DONE |
Darla L Downs
|
|
|
|
Issue and Print Permit | | | 1/7/2013 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 1/2/2013 | | DONE |
Tisha Gallop
|
|
|
|
Plan assigned to (Tim) | 12/31/2012 | | 12/31/2012 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 12/31/2012 | | 12/31/2012 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
1st review completed | | | 12/31/2012 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/31/2012 | | DONE |
Tim Frost
|
|
|
|
Application received | | | 12/21/2012 | | DONE |
|
|
|
Application submitted via PDS Online on Dec 21 2012 12:45PM
|