Miscellaneous action | | | 2/14/2013 | | DONE |
|
|
|
Plans taken to records for scanning
|
INSP-Final Inspection | 1/31/2013 | 2/1/2013 | 2/1/2013 | A | PASS |
Forrest France
|
|
|
Previous correction notice items verified for completion. Voltage monitor for the elevator shunt trip added while on site, as-builts recieved. Duct detectors and recall functions tested okay. Points map posted. Permit finaled.
|
INSP-Final Inspection | 1/29/2013 | 1/29/2013 | 1/29/2013 | P | FAIL |
Troy Cobbley
|
|
|
All fire pump devices were retested today and passed. Started to test the elevator recall and found that there are programing issues. We tried to test duct smoke detectors but found that some have not been wired for shutdown of the hvac units. Inspection to be rescheduled when the remaining items, as listed above, have been corrected and tested.
|
INSP-Final Inspection | 1/28/2013 | 1/28/2013 | 1/28/2013 | P | FAIL |
Troy Cobbley
|
|
|
Everything tested today except for the AES netcon needs to be retested. The signals sent to central station do not match what is being tested at the job site. Phase reversal and pump running are reversed. The manual pull station in the pump room is mounted too high.
|
INSP-Final Inspection | 1/25/2013 | 1/25/2013 | 1/25/2013 | P | CANC |
Troy Cobbley
|
|
|
Canceled due to time constraints. Brent Phone #: ###-####
|
Permit Ready to Issue | | | 1/25/2013 | | DONE |
Barbara Stitt
|
|
|
|
Inspection Record Card- Fire | 1/25/2013 | | 1/25/2013 | | DONE |
Barbara Stitt
|
|
|
|
Telephone call | | | 1/25/2013 | | DONE |
Barbara Stitt
|
|
|
Spoke with Wendy and told her that permit is ready & fees due on 1-25-13 @ 12:45pm
|
(F) Reprint permit | | | 1/25/2013 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 1/25/2013 | | DONE |
|
|
|
|
Plan assigned to (Stephanie) | 1/11/2013 | | 1/25/2013 | | DONE |
Stephanie L. Cobbley
|
|
|
|
Alarm Plan Check | 1/25/2013 | | 1/25/2013 | | PASS |
Stephanie L. Cobbley
|
|
|
Plan modification approved with redlines and review comments.
|
PLANS TAKEN FRONT DESK ALARM | | | 1/25/2013 | | DONE |
|
|
|
Approved plans taken to permit technician for processing.
|
Plan resubmittals received | | | 1/15/2013 | | DONE |
Tisha Gallop
|
|
|
revised documents received; taken to SLC
|
Plan resubmittals received | | | 1/11/2013 | | |
Barbara Stitt
|
|
|
Plan modification
|
Issue and Print Permit | | | 1/8/2013 | | DONE |
Barbara Stitt
|
|
|
|
Plan assigned to (Stephanie) | 1/2/2013 | | 1/3/2013 | | DONE |
Stephanie L. Cobbley
|
|
|
|
Telephone call | | | 1/3/2013 | | DONE |
|
|
|
Left a message with Mary at ECI. I explained that either a remote annunciator panel would need to be provided at the main entrance, or the FACP would need to be relocated to the main entrance. I asked that she please email to let me know which action she is going to take, and that if the annunciator is chosen to please provide data sheets and revised battery calculations.
|
Miscellaneous action | | | 1/3/2013 | | DONE |
|
|
|
Requested documentation received
|
1st review completed | | | 1/3/2013 | | PASS |
|
|
|
|
Alarm Plan Check | 1/3/2013 | | 1/3/2013 | | PASS |
Stephanie L. Cobbley
|
|
|
Plans approved with redlines and review comments.
|
PLANS TAKEN FRONT DESK ALARM | | | 1/3/2013 | | DONE |
|
|
|
Approved redlined plans taken to the permit technician for processing.
|
Telephone call | | | 1/3/2013 | | DONE |
Christina Prado
|
|
|
called Mike to advise permit is ready and gave fees due
|
Inspection Record Card- Fire | 1/3/2013 | | 1/3/2013 | | DONE |
Christina Prado
|
|
|
|
Permit Ready to Issue | | | 1/3/2013 | | DONE |
Christina Prado
|
|
|
|
Case Summary | | | 1/2/2013 | | DONE |
Barbara Stitt
|
|
|
|
Application received | | | 1/2/2013 | | DONE |
Barbara Stitt
|
|
|
|