INSP-Final Inspection | 2/4/2013 | 2/4/2013 | 2/4/2013 | P | PASS |
Troy Cobbley
|
|
|
permit finaled
|
INSP-Final Inspection | 1/31/2013 | 1/31/2013 | 1/31/2013 | P | FAIL |
Troy Cobbley
|
|
|
No ceiling tile has been installed yet.
|
Plan assigned to (Tim) | 1/31/2013 | | 1/31/2013 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 1/31/2013 | | 1/31/2013 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
1st review completed | | | 1/31/2013 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/31/2013 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 1/31/2013 | | DONE |
Christina Prado
|
|
|
|
CHANGE STATUS TO (ISS) | | | 1/31/2013 | | DONE |
Christina Prado
|
|
|
|
INSP-Sprinkler Rough-in | 1/30/2013 | 1/30/2013 | 1/30/2013 | P | PASS |
Troy Cobbley
|
|
|
Rough-in passed. Piping can be covered.
|
Sprinkler Plan Check | 1/10/2013 | | 1/10/2013 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/10/2013 | | DONE |
Tim Frost
|
|
|
|
Inspection Record Card- Fire | 1/10/2013 | | 1/10/2013 | | DONE |
Darla L Downs
|
|
|
|
Issue and Print Permit | | | 1/10/2013 | | DONE |
|
|
|
|
Sprinkler Plan Check | 1/9/2013 | | 1/9/2013 | | FAIL |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
1st review completed | | | 1/9/2013 | | PASS |
Tim Frost
|
|
|
|
Plan assigned to (Tim) | 1/4/2013 | | 1/4/2013 | | DONE |
Tim Frost
|
|
|
|
Early Start | | | 1/4/2013 | | PASS |
|
|
|
See Documents
|
Application received | | | 1/3/2013 | | DONE |
|
|
|
Application submitted via PDS Online on Jan 3 2013 11:34AM
|
Plan assigned to (Tim) | 1/3/2013 | | 1/3/2013 | | DONE |
Tim Frost
|
|
|
|