INSP-Final Inspection | 4/12/2013 | 4/12/2013 | 4/12/2013 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Final Inspection | 4/4/2013 | 4/5/2013 | 4/5/2013 | A | FAIL |
Troy Cobbley
|
|
|
See the city approved plans for locations where horn/strobes are overspaced or the candella is not set as per the approved plans. Locations are marked in red.
|
Alarm Plan Check | 3/6/2013 | | 3/6/2013 | | PASS |
Stephanie L. Cobbley
|
|
|
Plan modification approved with review comments
|
PLANS TAKEN FRONT DESK ALARM | | | 3/6/2013 | | DONE |
|
|
|
plan modification approved - updated in project dox
|
Permit Ready to Issue | | | 3/6/2013 | | DONE |
Christina Prado
|
|
|
|
CHANGE STATUS TO (ISS) | | | 3/6/2013 | | DONE |
Christina Prado
|
|
|
|
Plan assigned to (Stephanie) | 3/5/2013 | | 3/5/2013 | | DONE |
Stephanie L. Cobbley
|
|
|
|
Telephone call | | | 3/5/2013 | | DONE |
|
|
|
left message for Jason asking him to email me a revised one-line diagram (the one uploaded does not reflect the changes made to the plans) and a new submittal packet with the revised battery calculations and voltage drops included.
|
Plan resubmittals received | | | 3/1/2013 | | DONE |
|
|
|
plan modification resubmittals have been uploaded to project dox
|
Alarm Plan Check | 2/25/2013 | | 2/25/2013 | | FAIL |
Stephanie L. Cobbley
|
|
|
Plan modifications denied
|
Miscellaneous action | | | 2/20/2013 | | DONE |
|
|
|
Received an email request for a plan modification. Initiated workflow.
|
Plan resubmittals received | | | 2/20/2013 | | DONE |
|
|
|
Plan modifications uploaded to project dox
|
Plan assigned to (Stephanie) | 2/20/2013 | | 2/20/2013 | | DONE |
Stephanie L. Cobbley
|
|
|
|
INSP-Conference | 2/6/2013 | 2/7/2013 | 2/7/2013 | A | DONE |
Troy Cobbley
|
|
|
Dave and I went over visual notification corridor spacing.
|
Plan resubmittals received | | | 2/1/2013 | | DONE |
|
|
|
|
Alarm Plan Check | 2/1/2013 | | 2/1/2013 | | PASS |
Stephanie L. Cobbley
|
|
|
Plans approved with review comments.
|
PLANS TAKEN FRONT DESK ALARM | | | 2/1/2013 | | DONE |
|
|
|
updated in project dox
|
Permit Ready to Issue | | | 2/1/2013 | | |
|
|
|
|
Issue and Print Permit | | | 2/1/2013 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 2/1/2013 | | 2/1/2013 | | DONE |
Darla L Downs
|
|
|
|
1st review completed | | | 1/31/2013 | | FAIL |
|
|
|
|
Alarm Plan Check | 1/31/2013 | | 1/31/2013 | | FAIL |
Stephanie L. Cobbley
|
|
|
Plans denied - see change marks and review comments.
|
Miscellaneous action | | | 1/31/2013 | | DONE |
|
|
|
updated project dox regarding failed plans
|
Application received | | | 1/15/2013 | | DONE |
|
|
|
Application submitted via PDS Online on Jan 15 2013 10:15AM
|