INSP-Final Inspection | 4/25/2013 | 4/26/2013 | 4/26/2013 | P | PASS |
Troy Cobbley
|
|
|
permit finaled
|
INSP-Final Inspection | 4/24/2013 | 4/25/2013 | 4/25/2013 | P | CANC |
Troy Cobbley
|
|
|
Per Mike I rescheduled for tomorrow when I do the life safety inspection.
|
INSP-Sprinkler Rough-in | 4/23/2013 | 4/24/2013 | 4/24/2013 | A | PASS |
Troy Cobbley
|
|
|
Can final when the canopies are installed.
|
INSP-Sprinkler Rough-in | 4/23/2013 | 4/23/2013 | 4/23/2013 | P | CANC |
Troy Cobbley
|
|
|
per javier the as-builts are not ready. Re-scheduled for tomorrow morning.
|
INSP-Sprinkler Rough-in | 4/22/2013 | 4/22/2013 | 4/22/2013 | P | CANC |
Troy Cobbley
|
|
|
Overbooked. Javier is going to reschedule for tomorrow.
|
INSP-Sprinkler Rough-in | 3/27/2013 | 3/28/2013 | 3/28/2013 | A | PASS |
Troy Cobbley
|
|
|
Hard lids are ok to cover. I noted that there is a large shadow area with no sprinkler protection in the existing corridor that will need to be addressed prior to a final sign off.
|
Sprinkler Plan Check | 1/24/2013 | | 1/24/2013 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
1st review completed | | | 1/24/2013 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/24/2013 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 1/24/2013 | | |
|
|
|
|
Inspection Record Card- Fire | 1/24/2013 | | 1/24/2013 | | DONE |
Darla L Downs
|
|
|
|
Issue and Print Permit | | | 1/24/2013 | | |
|
|
|
|
Application received | | | 1/22/2013 | | DONE |
|
|
|
Application submitted via PDS Online on Jan 22 2013 2:18PM
|