Miscellaneous action | | | 9/25/2013 | | DONE |
|
|
|
Scanned application into Tidemark and Onbase
|
INSP-Final Inspection | 4/30/2013 | 5/1/2013 | 5/2/2013 | P | PASS |
Forrest France
|
|
|
Inspection passed, fire alarm permit finaled.
|
Issue and Print Permit | | | 2/7/2013 | | DONE |
Barbara Stitt
|
|
|
|
Plan assigned to (Stephanie) | 1/30/2013 | | 2/6/2013 | | DONE |
Stephanie L. Cobbley
|
|
|
|
Telephone call | | | 2/6/2013 | | DONE |
|
|
|
Called Jonathan at Protex to verify there is an existing smoke detector above the existing fire alarm control panel where the new remote power supply (i.e. NAC panel) is being installed. He had Rob call me back and he verified there is an existing detector.
|
1st review completed | | | 2/6/2013 | | PASS |
|
|
|
|
Alarm Plan Check | 2/6/2013 | | 2/6/2013 | | PASS |
Stephanie L. Cobbley
|
|
|
Plans approved with redlines and review comments.
|
PLANS TAKEN FRONT DESK ALARM | | | 2/6/2013 | | DONE |
|
|
|
Approved plans taken to the permit technician for processing.
|
Permit Ready to Issue | | | 2/6/2013 | | |
|
|
|
|
Inspection Record Card- Fire | 2/6/2013 | | 2/6/2013 | | DONE |
Darla L Downs
|
|
|
|
Telephone call | | | 2/6/2013 | | |
|
|
|
2-6-13 called Jonathan -Protex permit ready and fee given ///dld
|
Application received | | | 1/30/2013 | | |
|
|
|
|