Miscellaneous action | | | 9/23/2013 | | DONE |
Tim Frost
|
|
|
Sent to Records for scanning.
|
INSP-Final Inspection | 5/3/2013 | 5/6/2013 | 5/6/2013 | A | PASS |
Forrest France
|
|
|
Final inspection completed 5/3. Permit finaled.
|
INSP-Sprinkler Rough-in | 2/21/2013 | 2/22/2013 | 2/22/2013 | A | PART |
Tim Frost
|
|
|
*Re-assingned by Scott Arellano*
Insulation rough in inspection approved.
Lonnie Phone #: ###-####
|
INSP-Sprinkler Rough-in | 2/14/2013 | 2/15/2013 | 2/15/2013 | A | PASS |
Troy Cobbley
|
|
|
Rough-in passed for the most part. Still need to have the riser installed, tenting verified and the sprinkler protection provided above the fire place. Piping can not be covered until tenting has been approved. I also went over the location of the outside alarm bell with the electrician.
|
Issue and Print Permit | | | 2/14/2013 | | DONE |
|
|
|
|
Plan assigned to (Tim) | 2/1/2013 | | 2/6/2013 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 2/6/2013 | | 2/6/2013 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/6/2013 | | DONE |
Tim Frost
|
|
|
|
Telephone call | | | 2/6/2013 | | DONE |
Christina Prado
|
|
|
called TVFP to advise permit is ready and gave fees due
|
Permit Ready to Issue | | | 2/6/2013 | | DONE |
Christina Prado
|
|
|
|
Inspection Record Card- Fire | 2/6/2013 | | 2/6/2013 | | DONE |
Christina Prado
|
|
|
|
Plan resubmittals received | | | 2/5/2013 | | |
|
|
|
2-5-13 received 4 applications and 3 sets of plans sent to Tim F. in fire ///dld
|
Sprinkler Plan Check | 2/4/2013 | | 2/4/2013 | | FAIL |
Tim Frost
|
|
|
|
1st review completed | | | 2/4/2013 | | FAIL |
Tim Frost
|
|
|
|
Telephone call | | | 2/4/2013 | | DONE |
Christina Prado
|
|
|
called TVFP to advise original plans need to be picked up and new ones submitted for review
|
Miscellaneous action | | | 2/4/2013 | | DONE |
Tim Frost
|
|
|
Emailed review to contractor
|
Application received | | | 2/1/2013 | | |
|
|
|
|