INSP-Final Inspection | 2/18/2013 | 2/19/2013 | 2/19/2013 | A | PASS |
Forrest France
|
|
|
Fire sprinkler permit work passed final walkthrough.
|
INSP-Sprinkler Rough-in | 2/11/2013 | 2/11/2013 | 2/11/2013 | A | PART |
Forrest France
|
|
|
Overhead work at the drop ceilings approved for cover. In rack sprinkler rough-in also completed okay.
|
Permit Ready to Issue | | | 2/6/2013 | | DONE |
Christina Prado
|
|
|
|
Issue and Print Permit | | | 2/6/2013 | | DONE |
Christina Prado
|
|
|
|
Inspection Record Card- Fire | 2/6/2013 | | 2/6/2013 | | DONE |
Christina Prado
|
|
|
|
Plan assigned to (Tim) | 2/4/2013 | | 2/4/2013 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 2/4/2013 | | 2/4/2013 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 2/4/2013 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/4/2013 | | DONE |
Tim Frost
|
|
|
|
Application received | | | 2/1/2013 | | DONE |
|
|
|
Application submitted via PDS Online on Feb 1 2013 5:51PM
|