INSP-Final Inspection | 7/9/2013 | 7/10/2013 | 7/10/2013 | P | PASS |
Forrest France
|
|
|
Fire sprinkler work passed final walkthrough, permit finaled.
|
INSP-Final Inspection | 7/8/2013 | 7/9/2013 | 7/9/2013 | A | CANC |
Forrest France
|
|
|
Final inspection. Please call Rick at above number prior to arrival Phone #: ###-#### >> Inspection requested via web by Sam Ball Inspection cancelled from web by: Sam Ball
|
INSP-Sprinkler Rough-in | 6/28/2013 | 6/28/2013 | 6/28/2013 | A | PART |
Forrest France
|
|
|
Overhead work at grid ceilings in rooms 303, 304, and 305 including the meeting room are okay to cover.
|
INSP-Sprinkler Rough-in | 6/6/2013 | 6/6/2013 | 6/6/2013 | A | PART |
Forrest France
|
|
|
Fire sprinkler work at the sheetrock soffits in meeting room 301 approved for cover. Plans clouded and dated.
|
INSP-Final Inspection | 4/24/2013 | 4/24/2013 | 4/24/2013 | A | PART |
Forrest France
|
|
|
"Phase one" work completed satisfactory.
|
INSP-Sprinkler Rough-in | 3/22/2013 | 3/22/2013 | 3/22/2013 | A | PART |
Forrest France
|
|
|
Okay to cover sheetrock lids and cloud ceiling areas in "phase one" as noted on approved plans.
|
Permit Ready to Issue | | | 2/6/2013 | | DONE |
Christina Prado
|
|
|
|
Issue and Print Permit | | | 2/6/2013 | | DONE |
Christina Prado
|
|
|
|
Inspection Record Card- Fire | 2/6/2013 | | 2/6/2013 | | DONE |
Christina Prado
|
|
|
|
Sprinkler Plan Check | 2/5/2013 | | 2/5/2013 | | FAIL |
Tim Frost
|
|
|
|
1st review completed | | | 2/5/2013 | | FAIL |
Tim Frost
|
|
|
|
Plan assigned to (Tim) | 2/5/2013 | | 2/5/2013 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 2/5/2013 | | 2/5/2013 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/5/2013 | | DONE |
Tim Frost
|
|
|
|
Application received | | | 2/4/2013 | | DONE |
|
|
|
Application submitted via PDS Online on Feb 4 2013 12:59PM
|