INSP-Final Inspection | 6/6/2013 | 6/7/2013 | 6/7/2013 | A | PASS |
Troy Cobbley
|
|
|
permit finaled
|
INSP-Sprinkler Rough-in | 5/16/2013 | 5/17/2013 | 5/17/2013 | P | PASS |
Troy Cobbley
|
|
|
The remaining piping on the first floor is ok to cover.
|
INSP-Sprinkler Rough-in | 5/9/2013 | 5/10/2013 | 5/10/2013 | P | PASS |
Troy Cobbley
|
|
|
This is a rough to cover for the 1st floor. See the city approved plans for locations where piping can be covered.
|
INSP-Sprinkler Rough-in | 4/10/2013 | 4/10/2013 | 4/10/2013 | P | PASS |
Troy Cobbley
|
|
|
Previous correction items on second floor are now corrected and one soffit on the first floor is ok to cover. See red lines on city approved plans.
|
INSP-Sprinkler Rough-in | 4/9/2013 | 4/9/2013 | 4/9/2013 | P | PART |
Troy Cobbley
|
|
|
The 2nd floor sprinkler piping can be covered. I noted one location where the pendant head is too close to a wall and another where a pendant head is overspaced in a office.
|
INSP-Sprinkler Rough-in | 4/5/2013 | 4/5/2013 | 4/5/2013 | P | PASS |
Troy Cobbley
|
|
|
Rough in 1st fl.See the city approved plans for soffit locations where piping can be covered.
|
INSP-Sprinkler Rough-in | 3/19/2013 | 3/21/2013 | 3/21/2013 | P | PASS |
Troy Cobbley
|
|
|
Sprinkler piping above the first floor "shower room" is ok to cover. See city approved plans for locations.
|
INSP-Sprinkler Rough-in | 3/6/2013 | 3/7/2013 | 3/7/2013 | A | PASS |
Troy Cobbley
|
|
|
See the city approved plans for locations where the sprinkler piping can be covered by the hardlids.
|
Sprinkler Plan Check | 2/25/2013 | | 2/25/2013 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 2/25/2013 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/25/2013 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 2/25/2013 | | DONE |
Christina Prado
|
|
|
|
Issue and Print Permit | | | 2/25/2013 | | DONE |
Christina Prado
|
|
|
|
Inspection Record Card- Fire | 2/25/2013 | | 2/25/2013 | | DONE |
Christina Prado
|
|
|
|
Plan assigned to (Tim) | 2/21/2013 | | 2/21/2013 | | DONE |
Tim Frost
|
|
|
|
Application received | | | 2/19/2013 | | DONE |
|
|
|
Application submitted via PDS Online on Feb 19 2013 2:13PM
|