Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberFIR13-00095
StatusFinaled
Name CURTIS FIRE SPRINKLER SERVICE INC
Site Address 6125 W FAIRVIEW AVE
Project NameSALON EDEN
Customer Number 
ePlanReviewNo
Description
The fire sprinkler scope of work consists of protecting a restaurant with a new wet pipe system. The system is supplied through 4” underground, to a 2½” backflow preventer and riser. There is a remote 2½” FDC. The system is looped with varying pipe sizes. There is a small basement protected with one line of sprinklers.

Contractor Note: The City of Boise now has the capabilities to accept electronic plan submittals.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Miscellaneous action  3/6/2014 DONE
DetailsTim Frost
Sent to Records for scanning.
INSP-Final Inspection9/24/20139/25/20139/25/2013PPASS
DetailsTroy Cobbley
Permit finaled
INSP-Final Inspection9/23/20139/23/20139/23/2013PCANC
DetailsTroy Cobbley
Duplicate inspection
INSP-Final Inspection9/20/20139/23/20139/23/2013AFAIL
DetailsTroy Cobbley
The "well" needs to be installed at the FDC riser and provide tag for the backflow preventor and a head wrench.
INSP-Final Inspection8/20/20138/21/20138/21/2013AFAIL
DetailsTroy Cobbley
I stopped at the job site and found that the "well" has not been installed at the FDC as discussed. I also noted the signage at the bell is missing. I left Don a voice message.
Override - Parcel Holds8/20/20131/1/19008/20/2013  
Fire alarm inspection
INSP-Final Inspection8/1/20138/5/20138/5/2013PCANC
DetailsTroy Cobbley
don Phone #: ###-####
Override - Parcel Holds8/1/20131/1/19008/1/2013  
final fire
INSP-Supply line flush7/29/20137/29/20137/29/2013PPASS
DetailsTroy Cobbley
Underground flush passed
INSP-Sprinkler Rough-in/Hydro7/19/20137/22/20137/22/2013APASS
DetailsTroy Cobbley
Overhead hydro test passed. I noted that the fire dept connection has not been installed on the street side of the building. I spoke with Don and he is going to contact Tim Frost to verify an approved location for the fdc and the electric alarm bell.
INSP-Supply line flush7/19/20137/22/20137/22/2013ACANC
DetailsTroy Cobbley
Cancel per Don Phone #: ###-####
Telephone call  7/22/2013 DONE
Spoke with Don and told him the FDC had to be moved to the street side to building in order to meet code.
INSP-Sprinkler Rough-in7/18/20137/19/20137/19/2013APASS
DetailsTroy Cobbley
Rough-in now matches the plan modification.
Override - Parcel Holds7/19/20131/1/19007/19/2013  
fire inspection
Override - Parcel Holds7/19/20131/1/19007/19/2013  
fire inspection
Override - Parcel Holds7/18/20131/1/19007/18/2013  
This is just for a sire sprinkler inspection only
Sprinkler Plan Check6/24/2013 6/24/2013 PASS
DetailsTim Frost
Please, see attached comments.
PLANS/APPL TAKEN TO FRONT DESK  6/24/2013 DONE
DetailsTim Frost
Override - Parcel Holds  6/24/2013  
Inspection Record Card- Fire6/24/2013 6/24/2013 DONE
DetailsTisha Gallop
Override - Parcel Holds  6/24/2013  
Permit Ready to Issue  6/24/2013 DONE
DetailsTisha Gallop
Telephone call  6/24/2013  
called Don and told him plan mod is ready, fee due.
CHANGE STATUS TO (ISS)  6/24/2013 DONE
DetailsTisha Gallop
plan mod
Plan assigned to (Tim)5/30/2013 6/24/2013 DONE
DetailsTim Frost
Plan resubmittals received  6/19/2013 DONE
DetailsTisha Gallop
received three copies of application, submittal documents and plans; routed to fire review.
Sprinkler Plan Check6/3/2013 6/3/2013 FAIL
DetailsTim Frost
Miscellaneous action  6/3/2013 DONE
DetailsTim Frost
Emailed review to contractor
Telephone call  6/3/2013 DONE
DetailsBarbara Stitt
Called and told Don that plans failed review so they need picked up and resubmitted on 6-3-13 @ 11:35am///BAS
Plan resubmittals received  5/30/2013 DONE
DetailsChristina Prado
**PLAN MOD*** Recevied three sets of revised application, checklist, fire flow sheet, calcs and plans marked FP1; plans and docs taken to fire for review
INSP-Sprinkler Rough-in/Hydro4/29/20134/29/20134/29/2013PFAIL
DetailsTroy Cobbley
Due to extensive routing modifications, swing joints and additional sprinkler heads plan modifications will be needed for this project. Don is going to provide verification the pipe straps and screws are listed for hanging the 2" mains. Siesmic restraints are required for the branchlines. There is wood at the top of the old fire place so sprinkler protection as per the plans will be required. There appears to be an addtional combustible concealed space near the kitchen that will need sprinkler protection.
Override - Parcel Holds4/29/20131/1/19004/29/2013  
Fire r/i
INSP-Sprinkler Rough-in/Hydro3/25/20133/27/20133/27/2013APASS
DetailsTroy Cobbley
Todays inspection was an approval to cover the underground supply piping and an approval for the underground supply piping hydro test. I let Don know that as-builts showing the two additional 4" elbows will be required at the end of the project.
Issue and Print Permit  3/19/2013 DONE
DetailsBarbara Stitt
Plan assigned to (Tim)2/28/2013 3/18/2013 DONE
DetailsTim Frost
Sprinkler Plan Check3/18/2013 3/18/2013 PASS
DetailsTim Frost
Please, see attached comments.
PLANS/APPL TAKEN TO FRONT DESK  3/18/2013 DONE
DetailsTim Frost
Telephone call  3/18/2013 DONE
DetailsChristina Prado
Called Don to advise permit is ready and gave fees due
Permit Ready to Issue  3/18/2013 DONE
DetailsChristina Prado
Inspection Record Card- Fire3/18/2013 3/18/2013 DONE
DetailsChristina Prado
Plan resubmittals received  3/14/2013 DONE
DetailsTisha Gallop
received three copies of application, submittal documents and plans; routed to TRF
Sprinkler Plan Check3/8/2013 3/8/2013 FAIL
DetailsTim Frost
1st review completed  3/8/2013 FAIL
Miscellaneous action  3/8/2013 DONE
DetailsTim Frost
Emailed review to contractor
Telephone call  3/8/2013  
3-8-13 called Don at Curtis fire Fire Sprinkler permit needs to be picked up. ///dld
Application received  2/28/2013