Miscellaneous action | | | 3/6/2014 | | DONE |
Tim Frost
|
|
|
Sent to Records for scanning.
|
INSP-Final Inspection | 9/24/2013 | 9/25/2013 | 9/25/2013 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Final Inspection | 9/23/2013 | 9/23/2013 | 9/23/2013 | P | CANC |
Troy Cobbley
|
|
|
Duplicate inspection
|
INSP-Final Inspection | 9/20/2013 | 9/23/2013 | 9/23/2013 | A | FAIL |
Troy Cobbley
|
|
|
The "well" needs to be installed at the FDC riser and provide tag for the backflow preventor and a head wrench.
|
INSP-Final Inspection | 8/20/2013 | 8/21/2013 | 8/21/2013 | A | FAIL |
Troy Cobbley
|
|
|
I stopped at the job site and found that the "well" has not been installed at the FDC as discussed. I also noted the signage at the bell is missing. I left Don a voice message.
|
Override - Parcel Holds | 8/20/2013 | 1/1/1900 | 8/20/2013 | | |
|
|
|
Fire alarm inspection
|
INSP-Final Inspection | 8/1/2013 | 8/5/2013 | 8/5/2013 | P | CANC |
Troy Cobbley
|
|
|
don Phone #: ###-####
|
Override - Parcel Holds | 8/1/2013 | 1/1/1900 | 8/1/2013 | | |
|
|
|
final fire
|
INSP-Supply line flush | 7/29/2013 | 7/29/2013 | 7/29/2013 | P | PASS |
Troy Cobbley
|
|
|
Underground flush passed
|
INSP-Sprinkler Rough-in/Hydro | 7/19/2013 | 7/22/2013 | 7/22/2013 | A | PASS |
Troy Cobbley
|
|
|
Overhead hydro test passed. I noted that the fire dept connection has not been installed on the street side of the building. I spoke with Don and he is going to contact Tim Frost to verify an approved location for the fdc and the electric alarm bell.
|
INSP-Supply line flush | 7/19/2013 | 7/22/2013 | 7/22/2013 | A | CANC |
Troy Cobbley
|
|
|
Cancel per Don Phone #: ###-####
|
Telephone call | | | 7/22/2013 | | DONE |
|
|
|
Spoke with Don and told him the FDC had to be moved to the street side to building in order to meet code.
|
INSP-Sprinkler Rough-in | 7/18/2013 | 7/19/2013 | 7/19/2013 | A | PASS |
Troy Cobbley
|
|
|
Rough-in now matches the plan modification.
|
Override - Parcel Holds | 7/19/2013 | 1/1/1900 | 7/19/2013 | | |
|
|
|
fire inspection
|
Override - Parcel Holds | 7/19/2013 | 1/1/1900 | 7/19/2013 | | |
|
|
|
fire inspection
|
Override - Parcel Holds | 7/18/2013 | 1/1/1900 | 7/18/2013 | | |
|
|
|
This is just for a sire sprinkler inspection only
|
Sprinkler Plan Check | 6/24/2013 | | 6/24/2013 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/24/2013 | | DONE |
Tim Frost
|
|
|
|
Override - Parcel Holds | | | 6/24/2013 | | |
|
|
|
|
Inspection Record Card- Fire | 6/24/2013 | | 6/24/2013 | | DONE |
Tisha Gallop
|
|
|
|
Override - Parcel Holds | | | 6/24/2013 | | |
|
|
|
|
Permit Ready to Issue | | | 6/24/2013 | | DONE |
Tisha Gallop
|
|
|
|
Telephone call | | | 6/24/2013 | | |
|
|
|
called Don and told him plan mod is ready, fee due.
|
CHANGE STATUS TO (ISS) | | | 6/24/2013 | | DONE |
Tisha Gallop
|
|
|
plan mod
|
Plan assigned to (Tim) | 5/30/2013 | | 6/24/2013 | | DONE |
Tim Frost
|
|
|
|
Plan resubmittals received | | | 6/19/2013 | | DONE |
Tisha Gallop
|
|
|
received three copies of application, submittal documents and plans; routed to fire review.
|
Sprinkler Plan Check | 6/3/2013 | | 6/3/2013 | | FAIL |
Tim Frost
|
|
|
|
Miscellaneous action | | | 6/3/2013 | | DONE |
Tim Frost
|
|
|
Emailed review to contractor
|
Telephone call | | | 6/3/2013 | | DONE |
Barbara Stitt
|
|
|
Called and told Don that plans failed review so they need picked up and resubmitted on 6-3-13 @ 11:35am///BAS
|
Plan resubmittals received | | | 5/30/2013 | | DONE |
Christina Prado
|
|
|
**PLAN MOD*** Recevied three sets of revised application, checklist, fire flow sheet, calcs and plans marked FP1; plans and docs taken to fire for review
|
INSP-Sprinkler Rough-in/Hydro | 4/29/2013 | 4/29/2013 | 4/29/2013 | P | FAIL |
Troy Cobbley
|
|
|
Due to extensive routing modifications, swing joints and additional sprinkler heads plan modifications will be needed for this project. Don is going to provide verification the pipe straps and screws are listed for hanging the 2" mains. Siesmic restraints are required for the branchlines. There is wood at the top of the old fire place so sprinkler protection as per the plans will be required. There appears to be an addtional combustible concealed space near the kitchen that will need sprinkler protection.
|
Override - Parcel Holds | 4/29/2013 | 1/1/1900 | 4/29/2013 | | |
|
|
|
Fire r/i
|
INSP-Sprinkler Rough-in/Hydro | 3/25/2013 | 3/27/2013 | 3/27/2013 | A | PASS |
Troy Cobbley
|
|
|
Todays inspection was an approval to cover the underground supply piping and an approval for the underground supply piping hydro test. I let Don know that as-builts showing the two additional 4" elbows will be required at the end of the project.
|
Issue and Print Permit | | | 3/19/2013 | | DONE |
Barbara Stitt
|
|
|
|
Plan assigned to (Tim) | 2/28/2013 | | 3/18/2013 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 3/18/2013 | | 3/18/2013 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/18/2013 | | DONE |
Tim Frost
|
|
|
|
Telephone call | | | 3/18/2013 | | DONE |
Christina Prado
|
|
|
Called Don to advise permit is ready and gave fees due
|
Permit Ready to Issue | | | 3/18/2013 | | DONE |
Christina Prado
|
|
|
|
Inspection Record Card- Fire | 3/18/2013 | | 3/18/2013 | | DONE |
Christina Prado
|
|
|
|
Plan resubmittals received | | | 3/14/2013 | | DONE |
Tisha Gallop
|
|
|
received three copies of application, submittal documents and plans; routed to TRF
|
Sprinkler Plan Check | 3/8/2013 | | 3/8/2013 | | FAIL |
Tim Frost
|
|
|
|
1st review completed | | | 3/8/2013 | | FAIL |
|
|
|
|
Miscellaneous action | | | 3/8/2013 | | DONE |
Tim Frost
|
|
|
Emailed review to contractor
|
Telephone call | | | 3/8/2013 | | |
|
|
|
3-8-13 called Don at Curtis fire Fire Sprinkler permit needs to be picked up. ///dld
|
Application received | | | 2/28/2013 | | |
|
|
|
|