Miscellaneous action | | | 3/6/2014 | | DONE |
Tim Frost
|
|
|
Sent to Records for scanning.
|
INSP-Final Inspection | 10/28/2013 | 10/28/2013 | 10/28/2013 | P | PASS |
Forrest France
|
|
|
UG fire supply line permit approved for final status.
|
INSP-Supply line flush | 6/24/2013 | 6/24/2013 | 6/24/2013 | P | PASS |
Troy Cobbley
|
|
|
ug flush passed
|
INSP-Sprinkler Rough-in | 5/29/2013 | 5/29/2013 | 5/29/2013 | P | PART |
Forrest France
|
|
|
Point of connection to building riser stub okayed for bury- flushing to be completed prior to final.
|
INSP-Sprinkler Rough-in | 3/12/2013 | 3/13/2013 | 3/14/2013 | A | PART |
Forrest France
|
|
|
UG fire supply line okay for bury
|
Plan assigned to (Tim) | 3/5/2013 | | 3/12/2013 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 3/12/2013 | | 3/12/2013 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/12/2013 | | DONE |
Tim Frost
|
|
|
|
Miscellaneous action | | | 3/12/2013 | | DONE |
|
|
|
DOUBLE FEE working without a permit
|
Telephone call | | | 3/12/2013 | | DONE |
Christina Prado
|
|
|
called jon to advise permit is ready and gave fees due
|
Permit Ready to Issue | | | 3/12/2013 | | DONE |
Christina Prado
|
|
|
|
Inspection Record Card- Fire | 3/12/2013 | | 3/12/2013 | | DONE |
Christina Prado
|
|
|
|
Issue and Print Permit | | | 3/12/2013 | | DONE |
Barbara Stitt
|
|
|
|
Plan resubmittals received | | | 3/11/2013 | | |
|
|
|
|
1st review completed | | | 3/8/2013 | | FAIL |
|
|
|
|
Sprinkler Plan Check | 3/8/2013 | | 3/8/2013 | | FAIL |
Tim Frost
|
|
|
|
Miscellaneous action | | | 3/8/2013 | | DONE |
Tim Frost
|
|
|
Emailed review to contractor
|
Telephone call | | | 3/8/2013 | | DONE |
Tisha Gallop
|
|
|
called Jon Edes and left vm in general mailbox that denied plans are at front desk for pick up.
|
Application received | | | 3/5/2013 | | |
|
|
|
|