INSP-Final Inspection | 5/2/2013 | 5/7/2013 | 5/7/2013 | P | PASS |
Forrest France
|
|
|
Fire sprinkler permit work passed final walkthrough.
|
INSP-Sprinkler Rough-in | 4/22/2013 | 4/23/2013 | 4/23/2013 | A | PART |
Forrest France
|
|
|
Overhead work at the grid ceilings is approved for cover. Need to check coverage opposite new wall NW corner- added upright appears missing.
|
INSP-Sprinkler Rough-in | 4/18/2013 | 4/19/2013 | 4/19/2013 | A | CANC |
Troy Cobbley
|
|
|
don Phone #: ###-####
|
INSP-Sprinkler Rough-in | 3/20/2013 | 3/20/2013 | 3/21/2013 | P | PART |
Forrest France
|
|
|
Rough-in okay as noted, discussed existing upright coverage to be maintained at some areas, pendent coverage in need of adjustment- plans and field install will have differences.
|
Permit Ready to Issue | | | 3/18/2013 | | DONE |
Christina Prado
|
|
|
|
Issue and Print Permit | | | 3/18/2013 | | DONE |
Christina Prado
|
|
|
|
Inspection Record Card- Fire | 3/18/2013 | | 3/18/2013 | | DONE |
Christina Prado
|
|
|
|
Sprinkler Plan Check | 3/15/2013 | | 3/15/2013 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/15/2013 | | DONE |
Tim Frost
|
|
|
|
Plan assigned to (Tim) | 3/14/2013 | | 3/14/2013 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 3/14/2013 | | 3/14/2013 | | FAIL |
Tim Frost
|
|
|
|
1st review completed | | | 3/14/2013 | | FAIL |
|
|
|
|
Application received | | | 3/6/2013 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 6 2013 10:54AM
|