INSP-Final Inspection | 4/2/2013 | 4/2/2013 | 4/2/2013 | P | PASS |
Forrest France
|
|
|
Scope of fire sprinkler work passed final walkthrough.
|
INSP-Sprinkler Rough-in | 3/20/2013 | 3/21/2013 | 3/21/2013 | A | PART |
Forrest France
|
|
|
Okay to cover overhead work at the drop ceilings.
|
Issue and Print Permit | | | 3/19/2013 | | DONE |
Barbara Stitt
|
|
|
|
Plan assigned to (Tim) | 3/8/2013 | | 3/12/2013 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 3/12/2013 | | 3/12/2013 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/12/2013 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 3/12/2013 | | |
|
|
|
|
Inspection Record Card- Fire | 3/12/2013 | | 3/12/2013 | | DONE |
Darla L Downs
|
|
|
|
Telephone call | | | 3/12/2013 | | |
|
|
|
3-12-13 called Don - Curtis Fire- permit ready and fee given ///dld
|
Plan resubmittals received | | | 3/11/2013 | | |
|
|
|
|
Application received | | | 3/8/2013 | | |
|
|
|
|
Sprinkler Plan Check | 3/8/2013 | | 3/8/2013 | | FAIL |
Tim Frost
|
|
|
|
1st review completed | | | 3/8/2013 | | FAIL |
|
|
|
|
Telephone call | | | 3/8/2013 | | |
|
|
|
3-8-13 called Don - Curtis Fire Sprinkler left message permit needs to be picked up ///dld
|