INSP-Final Inspection | 4/3/2013 | 4/3/2013 | 4/3/2013 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Supply line flush | 4/2/2013 | 4/2/2013 | 4/2/2013 | P | PASS |
Troy Cobbley
|
|
|
Thi is an ug flush.
|
INSP-Supply line flush | 4/1/2013 | 4/1/2013 | 4/1/2013 | P | CANC |
Troy Cobbley
|
|
|
Not ready for a flush. To be rescheduled.
|
INSP-Sprinkler Rough-in/Hydro | 4/1/2013 | 4/1/2013 | 4/1/2013 | P | PASS |
Troy Cobbley
|
|
|
This is an ug hydro.
|
Permit Ready to Issue | | | 3/15/2013 | | DONE |
Christina Prado
|
|
|
|
Issue and Print Permit | | | 3/15/2013 | | DONE |
Christina Prado
|
|
|
|
Inspection Record Card- Fire | 3/15/2013 | | 3/15/2013 | | DONE |
Christina Prado
|
|
|
|
Sprinkler Plan Check | 3/14/2013 | | 3/14/2013 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 3/14/2013 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/14/2013 | | DONE |
Tim Frost
|
|
|
|
Plan assigned to (Tim) | 3/13/2013 | | 3/13/2013 | | DONE |
Tim Frost
|
|
|
|
Application received | | | 3/8/2013 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 8 2013 11:28AM
|