INSP-Final Inspection | 9/24/2013 | 9/25/2013 | 9/25/2013 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Sprinkler Rough-in | 7/29/2013 | 7/29/2013 | 7/29/2013 | P | PASS |
Troy Cobbley
|
|
|
See the city approved plans for additional ceiling areas that are ok to install and cover sprinkler piping.
|
INSP-Sprinkler Rough-in | 7/22/2013 | 7/22/2013 | 7/22/2013 | P | PASS |
Troy Cobbley
|
|
|
See the city approved plans for additional rooms marked "ok" in red where the sprinkler piping is ok to cover.
|
INSP-Final Inspection | 5/22/2013 | 5/22/2013 | 5/22/2013 | P | PART |
Troy Cobbley
|
|
|
The fire sprinkler work in the Procedure and Clean Rooms is complete.
|
INSP-Sprinkler Rough-in | 4/5/2013 | 4/5/2013 | 4/5/2013 | P | PASS |
Troy Cobbley
|
|
|
Remaining sprinkler piping is ok to cover.
|
INSP-Sprinkler Rough-in | 3/19/2013 | 3/20/2013 | 3/20/2013 | A | PASS |
Troy Cobbley
|
|
|
See the city approved plan for the location where the sprinkler piping can be covered.
|
Plan assigned to (Tim) | 3/18/2013 | | 3/18/2013 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 3/18/2013 | | 3/18/2013 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 3/18/2013 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/18/2013 | | DONE |
Tim Frost
|
|
|
|
Inspection Record Card- Fire | 3/18/2013 | | 3/18/2013 | | DONE |
Alexandra L. DeYoung
|
|
|
|
Permit Ready to Issue | | | 3/18/2013 | | DONE |
|
|
|
|
Issue and Print Permit | | | 3/18/2013 | | DONE |
|
|
|
|
Application received | | | 3/12/2013 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 12 2013 4:22PM
|