Case Summary | | | 1/30/2014 | | DONE |
|
|
|
|
INSP-Final Inspection | 4/30/2013 | 5/1/2013 | 5/1/2013 | A | PASS |
Forrest France
|
|
|
Noted correction items finished. Fire alarm permit finaled.
|
INSP-Final Inspection | 4/25/2013 | 4/26/2013 | 4/26/2013 | A | PART |
Forrest France
|
|
|
Wall post indicator valves must report as a supervisory condition. Remainder of fire alarm work passed inspection.
|
Miscellaneous action | | | 4/18/2013 | | DONE |
|
|
|
The applicant sent an email requesting to defer the annunciator requirement until the building is occupied by a tenant. I let him know that if you can see the fire alarm panel from the main entrance/front entry of the building, then we can defer the annunciator requirement in this case.
|
INSP-Final Inspection | 4/5/2013 | 4/10/2013 | 4/10/2013 | A | FAIL |
Forrest France
|
|
|
Provide remote annunciator per review notes item #1, PIV is not electronically supervised, provide lock and label at the panel breaker. Per contractor, offsite monitoring could not be verified.
|
Telephone call | | | 4/5/2013 | | DONE |
Christina Prado
|
|
|
Called Rob to advise permit is ready and gave fees due
|
Permit Ready to Issue | | | 4/5/2013 | | DONE |
Christina Prado
|
|
|
|
Inspection Record Card- Fire | 4/5/2013 | | 4/5/2013 | | DONE |
Christina Prado
|
|
|
|
Issue and Print Permit | | | 4/5/2013 | | DONE |
|
|
|
|
Plan assigned to (Stephanie) | 3/28/2013 | | 4/4/2013 | | DONE |
Stephanie L. Cobbley
|
|
|
|
1st review completed | | | 4/4/2013 | | PASS |
|
|
|
|
Alarm Plan Check | 4/4/2013 | | 4/4/2013 | | PASS |
Stephanie L. Cobbley
|
|
|
Plans approved with redlines and review comments
|
PLANS TAKEN FRONT DESK ALARM | | | 4/4/2013 | | DONE |
|
|
|
Approved plans taken to the permit technician for processing.
|
Application received | | | 3/28/2013 | | DONE |
Barbara Stitt
|
|
|
|