INSP-Final Inspection | 6/6/2013 | 6/6/2013 | 6/6/2013 | P | PASS |
Troy Cobbley
|
|
|
permit finaled
|
INSP-Sprinkler Rough-in | 4/8/2013 | 4/8/2013 | 4/8/2013 | P | PASS |
Troy Cobbley
|
|
|
Sprinkler piping can be covered. Three pendant heads are overspace and will be checked at the final inspection for proper spacing. Insulation at the roof deck needs to be repaired in two locations.
|
Sprinkler Plan Check | 4/1/2013 | | 4/1/2013 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 4/1/2013 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/1/2013 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 4/1/2013 | | DONE |
Christina Prado
|
|
|
|
Issue and Print Permit | | | 4/1/2013 | | DONE |
Christina Prado
|
|
|
|
Inspection Record Card- Fire | 4/1/2013 | | 4/1/2013 | | DONE |
Christina Prado
|
|
|
|
Plan assigned to (Tim) | 3/29/2013 | | 3/29/2013 | | DONE |
Tim Frost
|
|
|
|
Application received | | | 3/28/2013 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 28 2013 2:21PM
|